AGL 40.21 Increased By ▲ 0.18 (0.45%)
AIRLINK 127.64 Decreased By ▼ -0.06 (-0.05%)
BOP 6.67 Increased By ▲ 0.06 (0.91%)
CNERGY 4.45 Decreased By ▼ -0.15 (-3.26%)
DCL 8.73 Decreased By ▼ -0.06 (-0.68%)
DFML 41.16 Decreased By ▼ -0.42 (-1.01%)
DGKC 86.11 Increased By ▲ 0.32 (0.37%)
FCCL 32.56 Increased By ▲ 0.07 (0.22%)
FFBL 64.38 Increased By ▲ 0.35 (0.55%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 112.46 Increased By ▲ 1.69 (1.53%)
HUMNL 14.81 Decreased By ▼ -0.26 (-1.73%)
KEL 5.04 Increased By ▲ 0.16 (3.28%)
KOSM 7.36 Decreased By ▼ -0.09 (-1.21%)
MLCF 40.33 Decreased By ▼ -0.19 (-0.47%)
NBP 61.08 Increased By ▲ 0.03 (0.05%)
OGDC 194.18 Decreased By ▼ -0.69 (-0.35%)
PAEL 26.91 Decreased By ▼ -0.60 (-2.18%)
PIBTL 7.28 Decreased By ▼ -0.53 (-6.79%)
PPL 152.68 Increased By ▲ 0.15 (0.1%)
PRL 26.22 Decreased By ▼ -0.36 (-1.35%)
PTC 16.14 Decreased By ▼ -0.12 (-0.74%)
SEARL 85.70 Increased By ▲ 1.56 (1.85%)
TELE 7.67 Decreased By ▼ -0.29 (-3.64%)
TOMCL 36.47 Decreased By ▼ -0.13 (-0.36%)
TPLP 8.79 Increased By ▲ 0.13 (1.5%)
TREET 16.84 Decreased By ▼ -0.82 (-4.64%)
TRG 62.74 Increased By ▲ 4.12 (7.03%)
UNITY 28.20 Increased By ▲ 1.34 (4.99%)
WTL 1.34 Decreased By ▼ -0.04 (-2.9%)
BR100 10,086 Increased By 85.5 (0.85%)
BR30 31,170 Increased By 168.1 (0.54%)
KSE100 94,764 Increased By 571.8 (0.61%)
KSE30 29,410 Increased By 209 (0.72%)

ISLAMABAD: Pakistan Railways is spending Rs1862.84 million for the rehabilitation of 518 kilometres of track between Kotri-Khanpur under the project of Immediate Track Safety Works (ITSW-I).

Despite financial constraints, the management of Pakistan Railways is putting maximum efforts into improvement in infrastructure including tracks, bridges, stations etc, an official in the Ministry of Railways told APP.

Under the project of rehabilitation of Karachi Port tracks, 24-kilometer tracks, 17 level crossings and seven bridges have been rehabilitated along with the replacement of turnouts. The official said that Railway Dry Ports at Lahore (Mughalpura), Badami Bagh and Azakhel have been upgraded.

He said under the Immediate Track Safety Works (ITS W-II & IMTS W-III), the railway track between Tando Adam-Khanpur covering 456 kilometers would be rehabilitated at a cost of Rs 4830.437 million and Rs 4875.461 million respectively by replacing the US components of the track by ensuring the safety of train operation.

A PC-I amounting to Rs 4930.22 million for the rehabilitation of track machinery has been approved which would ensure quality of track maintenance work.

Meanwhile, 11 stations have been upgraded including Peshawar, Hassan Abdal, Rawalpindi, Gujranwala, Lahore, Narowal, Nankana Sahib, Raiwind, Okara, Sahiwal, and Bahawalpur, under PSDP projects.

“The project of upgradation of Main Line-I at a cost of $6.683 billion has been negotiated with the Chinese side for completing the ML-1 in two phases consisting of four packages,” he added.

About the assets of Pakistan Railways are mainly related to the track (11881 kilometres), rolling stock (15699), etc and most of these assets have lived their useful life. He said, “The department has taken several measures for efficient maintenance of these assets which included an increase in fiscal space for maintenance through transfer of pension, reduce utility bills through solarisation, improving procurement management through prioritized procurement and an efficient fuel management system.”

He said, “The department is gradually shifting from manual to a mechanized track maintenance regime for enhanced productivity and quality while improved governance of the maintenance system through the introduction of IT-related interventions (ERP, etc) and provision of professional human resources are also among the top priorities.”

“Regional Connectivity is an important aspect of the Pakistan Railway development framework. Presently, Pakistan Railway has planned to improve its functional links with regional countries including India and Iran,” he added.

Comments

Comments are closed.