AIRLINK 191.84 Decreased By ▼ -1.66 (-0.86%)
BOP 9.87 Increased By ▲ 0.23 (2.39%)
CNERGY 7.67 Increased By ▲ 0.14 (1.86%)
FCCL 37.86 Increased By ▲ 0.16 (0.42%)
FFL 15.76 Increased By ▲ 0.16 (1.03%)
FLYNG 25.31 Decreased By ▼ -0.28 (-1.09%)
HUBC 130.17 Increased By ▲ 3.10 (2.44%)
HUMNL 13.59 Increased By ▲ 0.09 (0.67%)
KEL 4.67 Increased By ▲ 0.09 (1.97%)
KOSM 6.21 Increased By ▲ 0.11 (1.8%)
MLCF 44.29 Increased By ▲ 0.33 (0.75%)
OGDC 206.87 Increased By ▲ 3.63 (1.79%)
PACE 6.56 Increased By ▲ 0.16 (2.5%)
PAEL 40.55 Decreased By ▼ -0.43 (-1.05%)
PIAHCLA 17.59 Increased By ▲ 0.10 (0.57%)
PIBTL 8.07 Increased By ▲ 0.41 (5.35%)
POWER 9.24 Increased By ▲ 0.16 (1.76%)
PPL 178.56 Increased By ▲ 4.31 (2.47%)
PRL 39.08 Increased By ▲ 1.01 (2.65%)
PTC 24.14 Increased By ▲ 0.07 (0.29%)
SEARL 107.85 Increased By ▲ 0.61 (0.57%)
SILK 0.97 No Change ▼ 0.00 (0%)
SSGC 39.11 Increased By ▲ 2.71 (7.45%)
SYM 19.12 Increased By ▲ 0.08 (0.42%)
TELE 8.60 Increased By ▲ 0.36 (4.37%)
TPLP 12.37 Increased By ▲ 0.59 (5.01%)
TRG 66.01 Increased By ▲ 1.13 (1.74%)
WAVESAPP 12.78 Increased By ▲ 1.15 (9.89%)
WTL 1.70 Increased By ▲ 0.02 (1.19%)
YOUW 3.95 Increased By ▲ 0.10 (2.6%)
BR100 11,930 Increased By 162.4 (1.38%)
BR30 35,660 Increased By 695.9 (1.99%)
KSE100 113,206 Increased By 1719 (1.54%)
KSE30 35,565 Increased By 630.8 (1.81%)

LUCKNOW: Rescue teams were unable on Wednesday to reach 40 workers trapped in a collapsed highway tunnel in India, as huge boulders were blocking efforts to create an evacuation passage, officials said.

It has been three days since the tunnel collapsed but the labourers continue to be safe and healthy, one official involved in the rescue operations told Reuters.

The trapped men have been given food, water and oxygen through a pipe since Sunday morning, after the tunnel caved in at 5:30 a.m. (0000 GMT).

“A heavy machine is being brought in from New Delhi to insert an evacuation pipe as the current one is being blocked by boulders,” G.S. Naveen, relief commissioner of Uttar Pradesh state, told Reuters.

There were about 50-60 men working on the night shift in the 4.5-km (3-mile) tunnel, which is being built in neighbouring Uttarakhand state on a national highway that is part of the Char Dham Hindu pilgrimage route.

Local media reported on Tuesday that those near the exit of the tunnel got out, while the 40 who were deeper inside were trapped.

The Char Dham highway is one of the most ambitious projects of Prime Minister Narendra Modi’s Hindu nationalist government.

It aims to connect four pilgrimage sites revered by Hindus in Uttarakhand through 890 km (550 miles) of roads being built at a cost of $1.5 billion.

The mountainous region is prone to landslides, earthquakes and floods and the incident follows events of land subsidence that geologists, residents and officials have blamed on rapid construction in the mountains.

Heavy machinery brought in to pull out Indian workers from collapsed tunnel

The project has faced criticism from environmental experts and some work had been halted after hundreds of houses were damaged by subsidence along the routes.

The work on the tunnel commenced in 2018 and was intended to be completed by July 2022, which has now been delayed to May 2024, a government statement said.

Comments

Comments are closed.