AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

ISLAMABAD: The Central Development Working Party (CDWP) cleared a development project at a cost of Rs23.835 billion for the Automated Indus Basin Irrigation System and recommended to the Executive Committee of the National Economic Council (ECNEC) for final approval.

The CDWP met with Planning Commission Deputy Chairman Dr Muhammad Jehanzeb Khan in the chair at P-Block Secretariat on Tuesday.

The CDWP discussed vital projects related to the energy, transport and communication, and water resource sectors.

The CDWP recommended the revised PC-1 titled Installation of Telemetry System for Real-Time Discharge Monitoring at 27 Key Sites on Indus Basin Irrigation System, presented by the Ministry of Water Resources with a total cost of Rs23.835 billion to the ECNEC for consideration. Indus Basin Irrigation System is proposed to be financed through PSDP. Rs500 million would be sponsored by the IRSA through its resources.

The project is under the ownership of the Indus River System Authority (IRSA), with execution responsibilities given to the Water and Power Development Authority (WAPDA). After a two-year post-completion period, the IRSA will take over the operation and maintenance of this transformative venture.

Currently, the Indus Basin’s irrigation water management system operates on manual procedures. Decisions regarding water distribution rely on manual calculations at barrages and information obtained through traditional means like phone or fax.

The absence of automated monitoring systems has led to a situation where gate positions are unknown, causing control issues for provincial irrigation departments and potential inter-provincial disputes.

To address these challenges, IRSA plans to install state-of-the-art telemetry equipment at 27 key locations. This equipment, proven effective in similar environmental conditions worldwide, will replace manual operations and provide real-time data on water flow and gate positions. The project aims to eliminate mistrust, harmonize provincial relationships, and ensure compliance with the Water Apportionment Accord of 1991.

The objectives of the project are multi-faceted ensuring online, accurate information on water availability and flow at key locations. The project includes the installation of cutting-edge equipment, the establishment of a data centre, and client workstations at key locations. This, in turn, will foster confidence, transparency, and equitable water sharing in line with government policies.

Additionally, the project’s completion will contribute to the overall improvement of the country’s social, agricultural, and industrial systems, generating employment opportunities during both the project execution and subsequent maintenance phases.

It is to be noted that the Indus River System Authority (IRSA), mandated by a 1992 Act of Parliament, plays a pivotal role in regulating and distributing surface waters among provinces in accordance with the Water Apportionment Accord of 1991.

Copyright Business Recorder, 2024

Comments

Comments are closed.