AGL 38.48 Decreased By ▼ -0.08 (-0.21%)
AIRLINK 203.02 Decreased By ▼ -4.75 (-2.29%)
BOP 10.17 Increased By ▲ 0.11 (1.09%)
CNERGY 6.54 Decreased By ▼ -0.54 (-7.63%)
DCL 9.58 Decreased By ▼ -0.41 (-4.1%)
DFML 40.02 Decreased By ▼ -1.12 (-2.72%)
DGKC 98.08 Decreased By ▼ -5.38 (-5.2%)
FCCL 34.96 Decreased By ▼ -1.39 (-3.82%)
FFBL 86.43 Decreased By ▼ -5.16 (-5.63%)
FFL 13.90 Decreased By ▼ -0.70 (-4.79%)
HUBC 131.57 Decreased By ▼ -7.86 (-5.64%)
HUMNL 14.02 Decreased By ▼ -0.08 (-0.57%)
KEL 5.61 Decreased By ▼ -0.36 (-6.03%)
KOSM 7.27 Decreased By ▼ -0.59 (-7.51%)
MLCF 45.59 Decreased By ▼ -1.69 (-3.57%)
NBP 66.38 Decreased By ▼ -7.38 (-10.01%)
OGDC 220.76 Decreased By ▼ -1.90 (-0.85%)
PAEL 38.48 Increased By ▲ 0.37 (0.97%)
PIBTL 8.91 Decreased By ▼ -0.36 (-3.88%)
PPL 197.88 Decreased By ▼ -7.97 (-3.87%)
PRL 39.03 Decreased By ▼ -0.82 (-2.06%)
PTC 25.47 Decreased By ▼ -1.15 (-4.32%)
SEARL 103.05 Decreased By ▼ -7.19 (-6.52%)
TELE 9.02 Decreased By ▼ -0.21 (-2.28%)
TOMCL 36.41 Decreased By ▼ -1.80 (-4.71%)
TPLP 13.75 Decreased By ▼ -0.02 (-0.15%)
TREET 25.12 Decreased By ▼ -1.33 (-5.03%)
TRG 58.04 Decreased By ▼ -2.50 (-4.13%)
UNITY 33.67 Decreased By ▼ -0.47 (-1.38%)
WTL 1.71 Decreased By ▼ -0.17 (-9.04%)
BR100 11,890 Decreased By -408.8 (-3.32%)
BR30 37,357 Decreased By -1520.9 (-3.91%)
KSE100 111,070 Decreased By -3790.4 (-3.3%)
KSE30 34,909 Decreased By -1287 (-3.56%)

Pakistan Petroleum Limited (PPL), a key supplier of natural gas in the county, has successfully drilled and tested hydrocarbon reserves in Adam-2 well, located in Adam D&PL Area, Hala Block, Sindh.

The E&P shared the development in its notice to the Pakistan Stock Exchange (PSX) on Tuesday.

“We wish to inform that as part of the field development activities in the Adam D&PL area, Hala JV has successfully drilled and tested Adam-2 well,” read the notice.

Hala JV is a joint venture between PPL and Mari Petroleum Company Limited (MPCL), with 65% and 35% working interest, respectively, and PPL as operator. With an area of about 395 square kilometres, the block straddles the Sanghar and Matiari districts in Sindh.

PPL said that Adam-2 well was a challenging development with associated risks and uncertainties.

“The well was drilled down to a depth of 3,421 meters and tested at approximately 6 million standard cubic feet per day (MMSCFD) gas and 450 barrels per day (BPD) condensate with a Wellhead Flowing Pressure (WHFP) of approximately 740 pounds per square inch (Psi) at 32/64-inch choke size,” read the notice.

PPL said that after tie-in, the gas will be processed at Hala Gas Processing Facility for onward supply to Sui Southern Gas Company Limited (SSGCL).

“The development well will add hydrocarbon reserves, enable the energy sector to reduce the gap between the supply and demand of oil and gas during the current energy crisis in the country and will save significant foreign exchange for the country,” read the notice.

Last week, the Board of Directors (BoD) of PPL approved, in-principle, funding of the Government of Balochistan’s (GoB) share of capital contribution in the BLZ Project.

“PPL shall arrange funding, from its cashflows, for GoB’s capital contribution through a financing arrangement. Debt servicing would be through GoB’s share of project cashflows,” read the notice back then.

Comments

Comments are closed.