AGL 38.50 Decreased By ▼ -0.06 (-0.16%)
AIRLINK 211.00 Increased By ▲ 3.23 (1.55%)
BOP 10.00 Decreased By ▼ -0.06 (-0.6%)
CNERGY 6.60 Decreased By ▼ -0.48 (-6.78%)
DCL 9.62 Decreased By ▼ -0.37 (-3.7%)
DFML 40.40 Decreased By ▼ -0.74 (-1.8%)
DGKC 99.50 Decreased By ▼ -3.96 (-3.83%)
FCCL 35.51 Decreased By ▼ -0.84 (-2.31%)
FFBL 86.50 Decreased By ▼ -5.09 (-5.56%)
FFL 14.16 Decreased By ▼ -0.44 (-3.01%)
HUBC 135.50 Decreased By ▼ -3.93 (-2.82%)
HUMNL 14.08 Decreased By ▼ -0.02 (-0.14%)
KEL 5.73 Decreased By ▼ -0.24 (-4.02%)
KOSM 7.30 Decreased By ▼ -0.56 (-7.12%)
MLCF 46.21 Decreased By ▼ -1.07 (-2.26%)
NBP 66.38 Decreased By ▼ -7.38 (-10.01%)
OGDC 221.60 Decreased By ▼ -1.06 (-0.48%)
PAEL 38.65 Increased By ▲ 0.54 (1.42%)
PIBTL 8.94 Decreased By ▼ -0.33 (-3.56%)
PPL 199.03 Decreased By ▼ -6.82 (-3.31%)
PRL 39.90 Increased By ▲ 0.05 (0.13%)
PTC 26.10 Decreased By ▼ -0.52 (-1.95%)
SEARL 104.50 Decreased By ▼ -5.74 (-5.21%)
TELE 9.18 Decreased By ▼ -0.05 (-0.54%)
TOMCL 37.70 Decreased By ▼ -0.51 (-1.33%)
TPLP 13.86 Increased By ▲ 0.09 (0.65%)
TREET 25.82 Decreased By ▼ -0.63 (-2.38%)
TRG 59.01 Decreased By ▼ -1.53 (-2.53%)
UNITY 33.72 Decreased By ▼ -0.42 (-1.23%)
WTL 1.75 Decreased By ▼ -0.13 (-6.91%)
BR100 12,076 Decreased By -222.5 (-1.81%)
BR30 37,921 Decreased By -956 (-2.46%)
KSE100 112,249 Decreased By -2611.3 (-2.27%)
KSE30 35,280 Decreased By -915.9 (-2.53%)

KARACHI: Mari Petroleum Company Limited (MPCL) has successfully drilled and tested the third appraisal well in the Ghazij formation in the Mari Development and Production Lease (D&PL) in Sindh.

This well is a part of the appraisal programme for the Ghazij discovery which was disclosed on January 25, 2023.

The well was spudded in on February 15, 2024, and drilled down to a depth of 1,483 meters. The post-acid gas flow rate from the well was 10.5 Million Standard Cubic Feet per Day (MMSCFD) with a WellHead Flowing Pressure (WHFP) of 490 pounds per square inch (Psi) at 64/64-inch choke size, material information sent to Pakistan Stock Exchange on Thursday said.

The well shall be put on production in due course after completion of requisite regulatory formalities.

Copyright Business Recorder, 2024

Comments

Comments are closed.