AIRLINK 189.36 Increased By ▲ 1.33 (0.71%)
BOP 11.10 Decreased By ▼ -0.76 (-6.41%)
CNERGY 7.28 Decreased By ▼ -0.26 (-3.45%)
FCCL 36.65 Decreased By ▼ -1.14 (-3.02%)
FFL 14.95 Decreased By ▼ -0.29 (-1.9%)
FLYNG 26.19 Increased By ▲ 0.66 (2.59%)
HUBC 130.89 Increased By ▲ 0.74 (0.57%)
HUMNL 13.47 Decreased By ▼ -0.14 (-1.03%)
KEL 4.28 Decreased By ▼ -0.07 (-1.61%)
KOSM 6.08 Decreased By ▼ -0.09 (-1.46%)
MLCF 45.94 Increased By ▲ 0.26 (0.57%)
OGDC 201.86 Decreased By ▼ -4.57 (-2.21%)
PACE 6.12 Decreased By ▼ -0.26 (-4.08%)
PAEL 38.36 Decreased By ▼ -1.95 (-4.84%)
PIAHCLA 16.73 Decreased By ▼ -0.22 (-1.3%)
PIBTL 7.94 Decreased By ▼ -0.09 (-1.12%)
POWER 9.86 Decreased By ▼ -0.17 (-1.69%)
PPL 173.46 Decreased By ▼ -5.38 (-3.01%)
PRL 34.73 Decreased By ▼ -1.63 (-4.48%)
PTC 23.95 Decreased By ▼ -0.44 (-1.8%)
SEARL 101.74 Decreased By ▼ -1.42 (-1.38%)
SILK 1.07 No Change ▼ 0.00 (0%)
SSGC 32.70 Decreased By ▼ -3.54 (-9.77%)
SYM 17.93 Decreased By ▼ -0.30 (-1.65%)
TELE 8.14 Decreased By ▼ -0.24 (-2.86%)
TPLP 12.02 Decreased By ▼ -0.14 (-1.15%)
TRG 67.40 Increased By ▲ 0.07 (0.1%)
WAVESAPP 11.80 Decreased By ▼ -0.21 (-1.75%)
WTL 1.52 Decreased By ▼ -0.05 (-3.18%)
YOUW 3.90 Increased By ▲ 0.01 (0.26%)
BR100 11,819 Decreased By -87.9 (-0.74%)
BR30 35,000 Decreased By -554.1 (-1.56%)
KSE100 112,085 Decreased By -478.8 (-0.43%)
KSE30 34,946 Decreased By -148 (-0.42%)

ISLAMABAD: The National Highways Authority (NHA) Executive Board recommended the PC-I (Land Acquisition) of China–Pakistan Economic Corridor (CPEC) KKH Phase-II (Thakot to Raikot) at a cost of Rs4.133 billion for approval of Executive Committee of National Economic Council (ECNEC).

Official documents revealed that Arshad Majeed Mohmand, chairman NHA presided over the meeting which deliberated on PC-I (Land Acquisition) CPEC KKH Phase-II (Thakot to Raikot) with a total length of 241km. The board recommended the PC-1 for approval of the ECNEC.

The NHA Executive Board recommended the “PC-I for Construction of Motorway from Ghulam Khan to Esa Khel (165.410 km)” at a cost of Rs117.469 billion for approval of Central Development Working Party (CDWP)/ ECNEC.

The NHA Executive Board also recommended the “PC-I Construction Quetta–Dhadar Section of N-65 (110.256 km)” at a cost of Rs55.379 billion for approval of CDWP/ECNEC.

The NHA Executive Board recommended the “PC-I for Dualisation and Strengthening of Dhadar–Jacobabad Section of N–65 (188 km)” at a cost of Rs50,824.93 million for approval of CDWP/ ECNEC.

The board recommended the “PC-I for Construction of Kharan–Basima Highway (123 km)” at a cost of Rs63.400 billion for approval of CDWP/ ECNEC. The NHA Executive Board recommended the “PC-I for Construction of Wangu Hill Tunnel on M-8 (22 km)” at a cost of Rs62,258.408 million for approval of CDWP/ ECNEC.

The board also recommended “PC-I of Electrical & Mechanical (E&M) works, operational buildings, bridges of Access Roads (PKG-II) and pending liability of Lowari Tunnel Project” amounting to Rs37.257 billion for approval of CDWP/ECNEC. The NHA will ensure third party validation prior to presenting this PC-I before CDWP.

Copyright Business Recorder, 2024

Comments

Comments are closed.