AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 129.06 Decreased By ▼ -0.47 (-0.36%)
BOP 6.75 Increased By ▲ 0.07 (1.05%)
CNERGY 4.49 Decreased By ▼ -0.14 (-3.02%)
DCL 8.55 Decreased By ▼ -0.39 (-4.36%)
DFML 40.82 Decreased By ▼ -0.87 (-2.09%)
DGKC 80.96 Decreased By ▼ -2.81 (-3.35%)
FCCL 32.77 No Change ▼ 0.00 (0%)
FFBL 74.43 Decreased By ▼ -1.04 (-1.38%)
FFL 11.74 Increased By ▲ 0.27 (2.35%)
HUBC 109.58 Decreased By ▼ -0.97 (-0.88%)
HUMNL 13.75 Decreased By ▼ -0.81 (-5.56%)
KEL 5.31 Decreased By ▼ -0.08 (-1.48%)
KOSM 7.72 Decreased By ▼ -0.68 (-8.1%)
MLCF 38.60 Decreased By ▼ -1.19 (-2.99%)
NBP 63.51 Increased By ▲ 3.22 (5.34%)
OGDC 194.69 Decreased By ▼ -4.97 (-2.49%)
PAEL 25.71 Decreased By ▼ -0.94 (-3.53%)
PIBTL 7.39 Decreased By ▼ -0.27 (-3.52%)
PPL 155.45 Decreased By ▼ -2.47 (-1.56%)
PRL 25.79 Decreased By ▼ -0.94 (-3.52%)
PTC 17.50 Decreased By ▼ -0.96 (-5.2%)
SEARL 78.65 Decreased By ▼ -3.79 (-4.6%)
TELE 7.86 Decreased By ▼ -0.45 (-5.42%)
TOMCL 33.73 Decreased By ▼ -0.78 (-2.26%)
TPLP 8.40 Decreased By ▼ -0.66 (-7.28%)
TREET 16.27 Decreased By ▼ -1.20 (-6.87%)
TRG 58.22 Decreased By ▼ -3.10 (-5.06%)
UNITY 27.49 Increased By ▲ 0.06 (0.22%)
WTL 1.39 Increased By ▲ 0.01 (0.72%)
BR100 10,445 Increased By 38.5 (0.37%)
BR30 31,189 Decreased By -523.9 (-1.65%)
KSE100 97,798 Increased By 469.8 (0.48%)
KSE30 30,481 Increased By 288.3 (0.95%)

ISLAMABAD: The installation process of Advanced Metering Infrastructure (AMI) meters equipped with modern technology and modern requirements is going on rapidly in two operation circles of IESCO Rawalpindi City and Rawalpindi Cantt.

Project Director AMI Mohsin Raza Gilani while giving details said that in the initial phase, advanced metering infrastructure (AMI) meters are being installed in the Rawalpindi City and Rawalpindi cantt circles and so far 275000 AMI meters have been replaced with old electricity meters and hopefully by the end of the year 2026, 1.2 million old meters of Rawalpindi City and Rawalpindi cant circles will be replaced with AMI meters.

Mohsin Raza Gilani said that in the arrears of Korang, Swan, DHA 2, Chaklala, Chandi Chowk, F Block, Saham, Khayaban Sir Syed, Gangal, Fiaiza, Murree Road, PWD, National Police Foundation, Media Town areas AMI meters have been installed and it is hoped that the target of installation of 1.2 million AMI meters will be achieved within the stipulated period. He said the advance metering Infrastructure AMI meters will ensure Automatic meter reading, control of electricity theft, elimination of system overloading, reduction in burn incidents of transformers and meters and will also ensure timely registration and rectification of valuable IESCO customers’ complaints.

Copyright Business Recorder, 2024

Comments

Comments are closed.