AGL 38.00 Increased By ▲ 0.06 (0.16%)
AIRLINK 197.50 Increased By ▲ 3.59 (1.85%)
BOP 9.56 Increased By ▲ 0.24 (2.58%)
CNERGY 5.96 Increased By ▲ 0.12 (2.05%)
DCL 8.87 Increased By ▲ 0.19 (2.19%)
DFML 35.65 Decreased By ▼ -0.81 (-2.22%)
DGKC 97.50 Increased By ▲ 4.96 (5.36%)
FCCL 35.30 Increased By ▲ 1.33 (3.92%)
FFBL 89.00 Increased By ▲ 6.70 (8.14%)
FFL 13.21 Increased By ▲ 0.46 (3.61%)
HUBC 127.70 Increased By ▲ 7.09 (5.88%)
HUMNL 13.49 Decreased By ▼ -0.11 (-0.81%)
KEL 5.38 Increased By ▲ 0.16 (3.07%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 45.00 Increased By ▲ 2.89 (6.86%)
NBP 61.90 Increased By ▲ 2.09 (3.49%)
OGDC 215.50 Increased By ▲ 4.33 (2.05%)
PAEL 39.05 Increased By ▲ 1.47 (3.91%)
PIBTL 8.24 Increased By ▲ 0.17 (2.11%)
PPL 192.40 Increased By ▲ 2.08 (1.09%)
PRL 38.57 Increased By ▲ 0.40 (1.05%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 105.98 Increased By ▲ 8.04 (8.21%)
TELE 8.28 Increased By ▲ 0.06 (0.73%)
TOMCL 35.25 Increased By ▲ 0.22 (0.63%)
TPLP 13.40 Decreased By ▼ -0.15 (-1.11%)
TREET 22.29 Decreased By ▼ -0.44 (-1.94%)
TRG 55.99 Increased By ▲ 3.12 (5.9%)
UNITY 33.00 Increased By ▲ 0.04 (0.12%)
WTL 1.62 Increased By ▲ 0.10 (6.58%)
BR100 11,739 Increased By 355.4 (3.12%)
BR30 36,418 Increased By 1206.5 (3.43%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

During the grand recovery operation against defaulting builders Karachi Water & Sewerage Board Recovery team disconnecting water and sewerage connections confiscated motors of 4 plazas. These plazas are defaulted of more than 7 millions rupees collectively. KW&SB disconnected the line and confiscate motors despite retaliation from miscreants at one of the plazas.
KW&SB has been contacting builders and motivating them to acquire NOC and approval of their water and sewerage connections and payment of their outstanding dues. However, builders have been ignoring KW&SB attempts causing millions of rupees in revenue. Grand recovery operation is targeted at builders and projects with illegal connections and defaulters.
During the operation, 2 inch diametre connection to Burj-ul-Harmain NC-21 Sector 44 Scheme 33 defaulter of 761 thousand, 2 inch diameter connection to Shaiz Residency FL-14 Block 3-A Gulshan-e-Iqbal defaulter of 4.87 million, 1 inch diameter connection to Al-Minal Tower-1 Plot S-B 8, Block 3-A Gulistan-e-Jauhar defaulter of 222 thousand, and Al-Minal Tower-2 Plot S-B 10, Block 3-A Gulistan-e-Jauhar defaulter of 283 thousand were disconnected and motors were confiscated.
KW&SB team was harassed during operation at Al-Minal Tower but KW&SB team despite miscreants' retaliation disconnected the lines. Builders of these projects have been provided with the chance to regularise their connections and pay KW&SB bills to continue using KW&SB facilities.
In this regard, M.D KW&SB has requested citizens that before booking flat, bungalow or shop in residential and commercial projects they should confirm that the builder has acquired NOC and approval of connections from KW&SB to avoid any troubles later. He requested that the citizens must cooperate with KW&SB since it is a public service institution providing water supply and sewerage facilities to the citizens of Karachi therefore citizens and builders must pay their outstanding bills to help stabilise KW&SB.-PR

Copyright Business Recorder, 2013

Comments

Comments are closed.