AIRLINK 200.02 Increased By ▲ 6.46 (3.34%)
BOP 10.23 Increased By ▲ 0.28 (2.81%)
CNERGY 7.83 Decreased By ▼ -0.10 (-1.26%)
FCCL 40.00 Decreased By ▼ -0.65 (-1.6%)
FFL 16.80 Decreased By ▼ -0.06 (-0.36%)
FLYNG 26.50 Decreased By ▼ -1.25 (-4.5%)
HUBC 132.79 Increased By ▲ 0.21 (0.16%)
HUMNL 13.99 Increased By ▲ 0.10 (0.72%)
KEL 4.67 Increased By ▲ 0.07 (1.52%)
KOSM 6.57 Decreased By ▼ -0.05 (-0.76%)
MLCF 46.66 Decreased By ▼ -0.94 (-1.97%)
OGDC 211.89 Decreased By ▼ -2.02 (-0.94%)
PACE 6.89 Decreased By ▼ -0.04 (-0.58%)
PAEL 41.34 Increased By ▲ 0.10 (0.24%)
PIAHCLA 17.02 Decreased By ▼ -0.13 (-0.76%)
PIBTL 8.13 Decreased By ▼ -0.28 (-3.33%)
POWER 9.37 Decreased By ▼ -0.27 (-2.8%)
PPL 181.45 Decreased By ▼ -0.90 (-0.49%)
PRL 41.60 Decreased By ▼ -0.36 (-0.86%)
PTC 24.69 Decreased By ▼ -0.21 (-0.84%)
SEARL 112.25 Increased By ▲ 5.41 (5.06%)
SILK 1.00 Increased By ▲ 0.01 (1.01%)
SSGC 44.00 Increased By ▲ 3.90 (9.73%)
SYM 19.18 Increased By ▲ 1.71 (9.79%)
TELE 8.91 Increased By ▲ 0.07 (0.79%)
TPLP 12.90 Increased By ▲ 0.15 (1.18%)
TRG 67.40 Increased By ▲ 0.45 (0.67%)
WAVESAPP 11.45 Increased By ▲ 0.12 (1.06%)
WTL 1.78 Decreased By ▼ -0.01 (-0.56%)
YOUW 4.00 Decreased By ▼ -0.07 (-1.72%)
BR100 12,170 Increased By 125.6 (1.04%)
BR30 36,589 Increased By 8.6 (0.02%)
KSE100 114,880 Increased By 842.7 (0.74%)
KSE30 36,125 Increased By 330.6 (0.92%)

Executing on growing the presence of renewable energy around the world, GE recently announced that it will supply equipment and procurement contractor HydroChina and wind farm customer Sapphire with 33 GE 1.5-82.5 wind turbines for the Sapphire Wind Power farm in Sindh. GE will also provide 10 years of operations and maintenance services as part of the contract.
The 33 wind turbines will comprise the first GE powered wind farm in Pakistan and will be constructed in the Gharo-Keti Bandar Wind Corridor. The wind farm has the capacity to generate 50 MW of electricity, helping Pakistan meet the five percent goal it has set for percentage of electricity generation from renewable sources by 2030. Though this is GE's first wind energy project with Sapphire and HydroChina, Sapphire has selected GE power generation equipment for more than 18 years-choosing GE's Jenbacher engines and gas turbines for projects located in the region.
"We chose GE wind turbines because they are a well-proven technology and widely installed around the world, especially in tropical climates like that of Pakistan," said Nadeem Abdullah, owner of the Sapphire Wind Power farm. "GE has been instrumental in supporting Sapphire to achieve financial closure with OPIC." Globally, GE has over 37 GW of installed wind turbine capacity, operating at over 98 percent availability.-PR

Copyright Business Recorder, 2014

Comments

Comments are closed.