AIRLINK 212.82 Increased By ▲ 3.27 (1.56%)
BOP 10.25 Decreased By ▼ -0.21 (-2.01%)
CNERGY 7.00 Decreased By ▼ -0.35 (-4.76%)
FCCL 33.47 Decreased By ▼ -0.92 (-2.68%)
FFL 17.64 Decreased By ▼ -0.41 (-2.27%)
FLYNG 21.82 Decreased By ▼ -1.10 (-4.8%)
HUBC 129.11 Decreased By ▼ -3.38 (-2.55%)
HUMNL 13.86 Decreased By ▼ -0.28 (-1.98%)
KEL 4.86 Decreased By ▼ -0.17 (-3.38%)
KOSM 6.93 Decreased By ▼ -0.14 (-1.98%)
MLCF 43.63 Decreased By ▼ -1.57 (-3.47%)
OGDC 212.95 Decreased By ▼ -5.43 (-2.49%)
PACE 7.22 Decreased By ▼ -0.36 (-4.75%)
PAEL 41.17 Decreased By ▼ -0.53 (-1.27%)
PIAHCLA 16.83 Decreased By ▼ -0.47 (-2.72%)
PIBTL 8.63 Increased By ▲ 0.08 (0.94%)
POWERPS 12.50 No Change ▼ 0.00 (0%)
PPL 183.03 Decreased By ▼ -6.00 (-3.17%)
PRL 39.63 Decreased By ▼ -2.70 (-6.38%)
PTC 24.73 Decreased By ▼ -0.44 (-1.75%)
SEARL 98.01 Decreased By ▼ -5.95 (-5.72%)
SILK 1.01 Decreased By ▼ -0.02 (-1.94%)
SSGC 41.73 Increased By ▲ 2.49 (6.35%)
SYM 18.86 Decreased By ▼ -0.30 (-1.57%)
TELE 9.00 Decreased By ▼ -0.24 (-2.6%)
TPLP 12.40 Decreased By ▼ -0.70 (-5.34%)
TRG 65.68 Decreased By ▼ -3.50 (-5.06%)
WAVESAPP 10.98 Increased By ▲ 0.26 (2.43%)
WTL 1.79 Increased By ▲ 0.08 (4.68%)
YOUW 4.03 Decreased By ▼ -0.11 (-2.66%)
BR100 11,866 Decreased By -213.1 (-1.76%)
BR30 35,697 Decreased By -905.3 (-2.47%)
KSE100 114,148 Decreased By -1904.2 (-1.64%)
KSE30 35,952 Decreased By -625.5 (-1.71%)

Prime Minister Nawaz Sharif has said overcoming terrorism and electricity shortage is the top priority of the government. He was talking to German Ambassador to Pakistan Dr Cyrill Nunn who called on him in Islamabad on Friday. The Prime Minister lauded German Ambassador for strengthening bilateral relations between the two countries. Meanwhile, it is reported that electricity shortfall has reached at least 4,400MW leading to increased hours of outages countrywide.
At least 12-hour long outages are being carried out in rural while eight-hour long in urban areas. It is reported that the demand of electricity is 19,300MW whereas the production is 14,900MW. The shortfall has reached 4,400MW due to increase in power demand. Besides this, duration of load shedding in areas going through line losses is more than 12 hours.

Copyright News Network International, 2015

Comments

Comments are closed.