AGL 38.16 Decreased By ▼ -0.06 (-0.16%)
AIRLINK 134.19 Increased By ▲ 5.22 (4.05%)
BOP 8.85 Increased By ▲ 1.00 (12.74%)
CNERGY 4.69 Increased By ▲ 0.03 (0.64%)
DCL 8.67 Increased By ▲ 0.35 (4.21%)
DFML 39.78 Increased By ▲ 0.84 (2.16%)
DGKC 85.15 Increased By ▲ 3.21 (3.92%)
FCCL 34.90 Increased By ▲ 1.48 (4.43%)
FFBL 75.60 Decreased By ▼ -0.11 (-0.15%)
FFL 12.74 Decreased By ▼ -0.08 (-0.62%)
HUBC 109.45 Decreased By ▼ -0.91 (-0.82%)
HUMNL 14.10 Increased By ▲ 0.09 (0.64%)
KEL 5.40 Increased By ▲ 0.25 (4.85%)
KOSM 7.75 Increased By ▲ 0.08 (1.04%)
MLCF 41.37 Increased By ▲ 1.57 (3.94%)
NBP 69.70 Decreased By ▼ -2.62 (-3.62%)
OGDC 193.62 Increased By ▲ 5.33 (2.83%)
PAEL 26.21 Increased By ▲ 0.58 (2.26%)
PIBTL 7.42 Increased By ▲ 0.05 (0.68%)
PPL 163.85 Increased By ▲ 11.18 (7.32%)
PRL 26.36 Increased By ▲ 0.97 (3.82%)
PTC 19.47 Increased By ▲ 1.77 (10%)
SEARL 84.40 Increased By ▲ 1.98 (2.4%)
TELE 7.99 Increased By ▲ 0.40 (5.27%)
TOMCL 34.05 Increased By ▲ 1.48 (4.54%)
TPLP 8.72 Increased By ▲ 0.30 (3.56%)
TREET 17.18 Increased By ▲ 0.40 (2.38%)
TRG 61.00 Increased By ▲ 4.96 (8.85%)
UNITY 28.96 Increased By ▲ 0.18 (0.63%)
WTL 1.37 Increased By ▲ 0.02 (1.48%)
BR100 10,786 Increased By 127.6 (1.2%)
BR30 32,266 Increased By 934.6 (2.98%)
KSE100 100,083 Increased By 813.5 (0.82%)
KSE30 31,193 Increased By 160.9 (0.52%)

Khyber Pakhtunkhwa Senior Minister for Local Government & Rural Development LG&RD) Inayatullah Khan called on PESCO PESCO Fazil Hasan at WAPDA House Peshawar on Monday and apprised him of the concerns of the people in respect of unscheduled and prolong load shedding in Malakand Division especially in Dir District.
Inayatullah made it clear to PESCO Chief that like Hazara Division, the consumers in Malakand Division also regularly pay electricity bills and no cases of power theft are reported there but load shedding of long duration and voltage fluctuations have become routine matter that must be checked properly, he added. The Senior Minister asked for drastic decrease in load shedding in Malakand Division. He also directed to complete all ongoing electricity distribution schemes in-time as well as expediting work on Chakdara Grid Station.
PESCO Chief assured the Senior Minister that load shedding in Malakand would be reduced to minimal level. Similarly, he assured for expediting work on Chakdara Grid Station and all other power supply schemes in the area to provide prompt relief to the consumers.

Copyright Business Recorder, 2015

Comments

Comments are closed.