AIRLINK 193.56 Decreased By ▼ -1.27 (-0.65%)
BOP 9.95 Increased By ▲ 0.14 (1.43%)
CNERGY 7.93 Increased By ▲ 0.57 (7.74%)
FCCL 40.65 Increased By ▲ 2.07 (5.37%)
FFL 16.86 Increased By ▲ 0.41 (2.49%)
FLYNG 27.75 Increased By ▲ 0.21 (0.76%)
HUBC 132.58 Increased By ▲ 0.83 (0.63%)
HUMNL 13.89 Increased By ▲ 0.03 (0.22%)
KEL 4.60 Decreased By ▼ -0.06 (-1.29%)
KOSM 6.62 Decreased By ▼ -0.04 (-0.6%)
MLCF 47.60 Increased By ▲ 2.21 (4.87%)
OGDC 213.91 Decreased By ▼ -0.08 (-0.04%)
PACE 6.93 Increased By ▲ 0.07 (1.02%)
PAEL 41.24 Increased By ▲ 1.18 (2.95%)
PIAHCLA 17.15 Increased By ▲ 0.36 (2.14%)
PIBTL 8.41 Increased By ▲ 0.09 (1.08%)
POWER 9.64 Increased By ▲ 0.21 (2.23%)
PPL 182.35 Increased By ▲ 0.16 (0.09%)
PRL 41.96 Increased By ▲ 0.13 (0.31%)
PTC 24.90 Increased By ▲ 0.34 (1.38%)
SEARL 106.84 Increased By ▲ 4.31 (4.2%)
SILK 0.99 Decreased By ▼ -0.01 (-1%)
SSGC 40.10 Increased By ▲ 0.66 (1.67%)
SYM 17.47 Increased By ▲ 0.14 (0.81%)
TELE 8.84 Increased By ▲ 0.08 (0.91%)
TPLP 12.75 No Change ▼ 0.00 (0%)
TRG 66.95 Increased By ▲ 1.55 (2.37%)
WAVESAPP 11.33 Increased By ▲ 0.22 (1.98%)
WTL 1.79 Increased By ▲ 0.09 (5.29%)
YOUW 4.07 Increased By ▲ 0.13 (3.3%)
BR100 12,045 Increased By 70.8 (0.59%)
BR30 36,580 Increased By 433.6 (1.2%)
KSE100 114,038 Increased By 594.4 (0.52%)
KSE30 35,794 Increased By 159 (0.45%)

Pakistan Civil Aviation Authority (PCAA) has embarked upon a plan to uplift air navigation infrastructure and airports for safe and efficient operations of aircraft in pursuant of the New Aviation Policy 2015. It also involves the up-gradation of Instrument Landing System (ILS) to CAT-IIIB at Allama Iqbal International Airport (AIIAP).
The Lahore Airport Manager of Civil Aviation Authority Mirza Akthar highlighting the salient feature of the project said that the up-gradation would address the long outstanding issue regarding disruption of flights at Lahore during intense fog and smog conditions, ensuring safe and uninterrupted flight operations.
This state of the art ILS CAT-IIIB system is supplemented by Advanced Airfield Lighting System and Surface Movement Radar. "Combination of these systems will facilitate precision approach and landing guidance to the aircraft during inclement weather conditions" he added. "Earlier landing at Lahore was not possible below 350 meters visibility, but now with the help of ILS CAT-IIIB, landing would be possible even up to 50 meters visibility during the intense fog he maintained. ILS Cat-III B upgrade project comprises installation of various components he said. "Significant work on the project which includes upgrade of ILS to CAT-IIIB, installation of associated airfield lighting system on primary runway and one of the linked taxiways will be complete by December 1, 2015" he pointed out.

Copyright Business Recorder, 2015

Comments

Comments are closed.