AGL 37.90 Decreased By ▼ -0.12 (-0.32%)
AIRLINK 213.50 Increased By ▲ 16.14 (8.18%)
BOP 9.85 Increased By ▲ 0.31 (3.25%)
CNERGY 6.51 Increased By ▲ 0.60 (10.15%)
DCL 9.22 Increased By ▲ 0.40 (4.54%)
DFML 37.55 Increased By ▲ 1.81 (5.06%)
DGKC 101.10 Increased By ▲ 4.24 (4.38%)
FCCL 35.90 Increased By ▲ 0.65 (1.84%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 14.49 Increased By ▲ 1.32 (10.02%)
HUBC 134.50 Increased By ▲ 6.95 (5.45%)
HUMNL 13.70 Increased By ▲ 0.20 (1.48%)
KEL 5.70 Increased By ▲ 0.38 (7.14%)
KOSM 7.23 Increased By ▲ 0.23 (3.29%)
MLCF 45.80 Increased By ▲ 1.10 (2.46%)
NBP 61.25 Decreased By ▼ -0.17 (-0.28%)
OGDC 228.30 Increased By ▲ 13.63 (6.35%)
PAEL 41.22 Increased By ▲ 2.43 (6.26%)
PIBTL 8.63 Increased By ▲ 0.38 (4.61%)
PPL 202.55 Increased By ▲ 9.47 (4.9%)
PRL 40.08 Increased By ▲ 1.42 (3.67%)
PTC 27.75 Increased By ▲ 1.95 (7.56%)
SEARL 108.74 Increased By ▲ 5.14 (4.96%)
TELE 8.60 Increased By ▲ 0.30 (3.61%)
TOMCL 36.22 Increased By ▲ 1.22 (3.49%)
TPLP 14.10 Increased By ▲ 0.80 (6.02%)
TREET 24.38 Increased By ▲ 2.22 (10.02%)
TRG 61.15 Increased By ▲ 5.56 (10%)
UNITY 34.50 Increased By ▲ 1.53 (4.64%)
WTL 1.72 Increased By ▲ 0.12 (7.5%)
BR100 12,200 Increased By 473.4 (4.04%)
BR30 38,121 Increased By 1744.8 (4.8%)
KSE100 113,775 Increased By 4261.6 (3.89%)
KSE30 35,994 Increased By 1481 (4.29%)

A meeting of the sub-committee of National Assembly Standing Committee on Water and Power was held at Wapda House Peshawar, here on Wednesday. Dr Syed Ghazi Ghulab Jamal presided over the meeting. Members of the committee Junaid Akbar,Sahibzada Muhammad Yaqub, Mulana Muhammad Gohar Shah, Chief Executive Pesco Syed Hassan Fazil, CEO Tesco Zakaullah Ghandapur, NTDC representatives, Pesco and Tesco high officials attended the meeting.
Committee was told that two new grid stations were constructed in Khyber Pakhtunkhwa recently with a cost of Rs 477 million while several grid stations were upgraded with a cost of Rs 140 million and 38 new grid stations will be constructed in different parts of the province with a cost of Rs 21 billion while nine grid stations will be upgraded. In the meeting important points of developmental works with the collaboration of NTDC were discussed and necessary instructions were issued in this regard. Committee was also briefed about line losses and it was assured that all efforts are being made to gradually decrease the line losses.

Copyright Business Recorder, 2015

Comments

Comments are closed.