AGL 38.14 Increased By ▲ 0.12 (0.32%)
AIRLINK 214.66 Increased By ▲ 17.30 (8.77%)
BOP 9.83 Increased By ▲ 0.29 (3.04%)
CNERGY 6.78 Increased By ▲ 0.87 (14.72%)
DCL 9.15 Increased By ▲ 0.33 (3.74%)
DFML 38.75 Increased By ▲ 3.01 (8.42%)
DGKC 100.28 Increased By ▲ 3.42 (3.53%)
FCCL 36.65 Increased By ▲ 1.40 (3.97%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 14.49 Increased By ▲ 1.32 (10.02%)
HUBC 134.30 Increased By ▲ 6.75 (5.29%)
HUMNL 13.70 Increased By ▲ 0.20 (1.48%)
KEL 5.71 Increased By ▲ 0.39 (7.33%)
KOSM 7.30 Increased By ▲ 0.30 (4.29%)
MLCF 45.75 Increased By ▲ 1.05 (2.35%)
NBP 61.51 Increased By ▲ 0.09 (0.15%)
OGDC 233.49 Increased By ▲ 18.82 (8.77%)
PAEL 40.75 Increased By ▲ 1.96 (5.05%)
PIBTL 8.59 Increased By ▲ 0.34 (4.12%)
PPL 204.61 Increased By ▲ 11.53 (5.97%)
PRL 40.15 Increased By ▲ 1.49 (3.85%)
PTC 28.25 Increased By ▲ 2.45 (9.5%)
SEARL 109.15 Increased By ▲ 5.55 (5.36%)
TELE 8.74 Increased By ▲ 0.44 (5.3%)
TOMCL 36.00 Increased By ▲ 1.00 (2.86%)
TPLP 13.90 Increased By ▲ 0.60 (4.51%)
TREET 24.38 Increased By ▲ 2.22 (10.02%)
TRG 61.15 Increased By ▲ 5.56 (10%)
UNITY 34.76 Increased By ▲ 1.79 (5.43%)
WTL 1.72 Increased By ▲ 0.12 (7.5%)
BR100 12,263 Increased By 536.8 (4.58%)
BR30 38,435 Increased By 2058.7 (5.66%)
KSE100 114,074 Increased By 4561.2 (4.16%)
KSE30 36,093 Increased By 1579.2 (4.58%)

Balochistan Chief Minister Dr Abdul Malik Baloch inspected Samungli Flyover site, here on Friday. Balochistan Chief Secretary Saifullah Chatha, Secretary Home Akbar Hussain Durrani, IG Police Muhammad Amlish, Principal Secretary Muhammad Naseem Lehri, Secretary Communication and Works Haji Ali Ahmed Mengal, Commissioner Quetta Division Qambar Dashti and others were also present.
The Chief Minister was briefed that the project would cost Rs 1,499.225 million. Flyover would be 385-km long and 16.10 metres wide. Besides, 814.27 metres long service road would also be built having 8.20 metre width. He was told that the project would take 24 months to complete. Around 22,000 vehicles would cross the fly over daily, which would ease the traffic burden. The Chief Minister directed the officials of communication and works that the project should be completed within 12 months instead of 24 months so that difficulties of people during construction of fly over were minimised.
He further directed that road should not be broken for building service road ahead of schedule. He also directed that period and standard of the project should be maintained.

Copyright Pakistan Press International, 2015

Comments

Comments are closed.