AGL 38.00 Increased By ▲ 0.06 (0.16%)
AIRLINK 197.50 Increased By ▲ 3.59 (1.85%)
BOP 9.56 Increased By ▲ 0.24 (2.58%)
CNERGY 5.96 Increased By ▲ 0.12 (2.05%)
DCL 8.87 Increased By ▲ 0.19 (2.19%)
DFML 35.65 Decreased By ▼ -0.81 (-2.22%)
DGKC 97.50 Increased By ▲ 4.96 (5.36%)
FCCL 35.30 Increased By ▲ 1.33 (3.92%)
FFBL 89.00 Increased By ▲ 6.70 (8.14%)
FFL 13.21 Increased By ▲ 0.46 (3.61%)
HUBC 127.70 Increased By ▲ 7.09 (5.88%)
HUMNL 13.49 Decreased By ▼ -0.11 (-0.81%)
KEL 5.38 Increased By ▲ 0.16 (3.07%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 45.00 Increased By ▲ 2.89 (6.86%)
NBP 61.90 Increased By ▲ 2.09 (3.49%)
OGDC 215.50 Increased By ▲ 4.33 (2.05%)
PAEL 39.05 Increased By ▲ 1.47 (3.91%)
PIBTL 8.24 Increased By ▲ 0.17 (2.11%)
PPL 192.40 Increased By ▲ 2.08 (1.09%)
PRL 38.57 Increased By ▲ 0.40 (1.05%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 105.98 Increased By ▲ 8.04 (8.21%)
TELE 8.28 Increased By ▲ 0.06 (0.73%)
TOMCL 35.25 Increased By ▲ 0.22 (0.63%)
TPLP 13.40 Decreased By ▼ -0.15 (-1.11%)
TREET 22.29 Decreased By ▼ -0.44 (-1.94%)
TRG 55.99 Increased By ▲ 3.12 (5.9%)
UNITY 33.00 Increased By ▲ 0.04 (0.12%)
WTL 1.62 Increased By ▲ 0.10 (6.58%)
BR100 11,739 Increased By 355.4 (3.12%)
BR30 36,418 Increased By 1206.5 (3.43%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

More than 39,000 smart meters have been installed successfully under USAID-funded AMI Project which has been implemented in Mepco and Pesco to cater to the small industrial, agricultural (tube wells), and public sector consumers. This project has launched to reduce distribution losses and modernise the electricity metering and billing operations. In Mepco, more than 39,000 smart meters have been installed so far.
These meters were installed in series with existing billing meters and automatically transfers the metering data via GSM/ GPRS communication medium to the server after specified time interval. Under a phase wise programme, the billing operations will be transferred to these AMR meters. One sub division has been effectively integrated with the billing system in order to eradicate any problem that might arise in the operations of the system. After successfully converting the billing of one sub division, the project is in the second phase to integrate other sub divisions with the billing system. A Pakistani company has implemented the complete solution comprising smart meters, IT infrastructure and software. Also, AMI Cell has been established at Mepco office with trained staff for smooth transferring and integration of the billing operations.

Copyright Business Recorder, 2015

Comments

Comments are closed.