AGL 37.99 Decreased By ▼ -0.03 (-0.08%)
AIRLINK 215.53 Increased By ▲ 18.17 (9.21%)
BOP 9.80 Increased By ▲ 0.26 (2.73%)
CNERGY 6.79 Increased By ▲ 0.88 (14.89%)
DCL 9.17 Increased By ▲ 0.35 (3.97%)
DFML 38.96 Increased By ▲ 3.22 (9.01%)
DGKC 100.25 Increased By ▲ 3.39 (3.5%)
FCCL 36.70 Increased By ▲ 1.45 (4.11%)
FFBL 88.94 No Change ▼ 0.00 (0%)
FFL 14.49 Increased By ▲ 1.32 (10.02%)
HUBC 134.13 Increased By ▲ 6.58 (5.16%)
HUMNL 13.63 Increased By ▲ 0.13 (0.96%)
KEL 5.69 Increased By ▲ 0.37 (6.95%)
KOSM 7.32 Increased By ▲ 0.32 (4.57%)
MLCF 45.87 Increased By ▲ 1.17 (2.62%)
NBP 61.28 Decreased By ▼ -0.14 (-0.23%)
OGDC 232.59 Increased By ▲ 17.92 (8.35%)
PAEL 40.73 Increased By ▲ 1.94 (5%)
PIBTL 8.58 Increased By ▲ 0.33 (4%)
PPL 203.34 Increased By ▲ 10.26 (5.31%)
PRL 40.81 Increased By ▲ 2.15 (5.56%)
PTC 28.31 Increased By ▲ 2.51 (9.73%)
SEARL 108.51 Increased By ▲ 4.91 (4.74%)
TELE 8.74 Increased By ▲ 0.44 (5.3%)
TOMCL 35.83 Increased By ▲ 0.83 (2.37%)
TPLP 13.84 Increased By ▲ 0.54 (4.06%)
TREET 24.38 Increased By ▲ 2.22 (10.02%)
TRG 61.15 Increased By ▲ 5.56 (10%)
UNITY 34.84 Increased By ▲ 1.87 (5.67%)
WTL 1.72 Increased By ▲ 0.12 (7.5%)
BR100 12,244 Increased By 517.6 (4.41%)
BR30 38,419 Increased By 2042.6 (5.62%)
KSE100 113,924 Increased By 4411.3 (4.03%)
KSE30 36,044 Increased By 1530.5 (4.43%)

Pakistan has not struck any deal with Qatar to import Liquefied Natural Gas (LNG) on long-term basis as yet. "No long-term LNG deal has been signed with Qatar as yet and there was no truth in those rumours and reports following minister's visit abroad," remarked Secretary Petroleum and Natural Resource Arshad Mirza when asked about the LNG project.
The Secretary said the minister was abroad to address some other matters, and assured the government was taking concrete measures to offset energy shortfall. Another official of the Ministry said since the government was fully aware of growing energy needs with gas demand swelling to over six billion cubic feet per day (Bcfd) and depleting hydrocarbon resources, a multi-pronged strategy was being pursued to tackle the energy shortage in the country.
He said the government had to work out the issues for import of Liquefied Natural Gas (LNG) to meet energy needs besides opting for long-term projects such as Pakistan-Iran gas pipelines, TAPI projects and many measures on domestic front. Replying to a question, he said the major gas reserves of the country are depleting fast, necessitating the exploration of more options and resources to meet the country's gas demand.
He said geo-political situation did affect the ambitious transnational projects including Pakistan-Iran gas pipeline and the TAPI project. Elaborating the point, he said the government was fully geared up to jumpstart work on the project and get 750 mmcfd per day, once sanctions on Iran were either relaxed or lifted altogether. Similarly, a ground-breaking ceremony for Turkeminstation-Afghanistan-Pakistan-India (TAPI) pipelines project is expected to take place in December, reflecting how government's efforts are yielding results, he added. Answering a question, the official said refining industry was not performing optimally with all of them going outdated and were operating at low capacity, resulting in additional import of petroleum products.

Copyright Associated Press of Pakistan, 2015

Comments

Comments are closed.