AGL 37.80 Increased By ▲ 0.30 (0.8%)
AIRLINK 218.50 Decreased By ▼ -4.39 (-1.97%)
BOP 10.93 Increased By ▲ 0.11 (1.02%)
CNERGY 7.57 Increased By ▲ 0.01 (0.13%)
DCL 9.16 Decreased By ▼ -0.26 (-2.76%)
DFML 40.35 Decreased By ▼ -0.61 (-1.49%)
DGKC 102.11 Decreased By ▼ -4.65 (-4.36%)
FCCL 34.95 Decreased By ▼ -2.12 (-5.72%)
FFL 19.50 Increased By ▲ 0.26 (1.35%)
HASCOL 12.70 Decreased By ▼ -0.48 (-3.64%)
HUBC 131.00 Decreased By ▼ -1.64 (-1.24%)
HUMNL 14.59 Decreased By ▼ -0.14 (-0.95%)
KEL 5.19 Decreased By ▼ -0.21 (-3.89%)
KOSM 7.35 Decreased By ▼ -0.13 (-1.74%)
MLCF 45.80 Decreased By ▼ -2.38 (-4.94%)
NBP 66.04 Decreased By ▼ -0.25 (-0.38%)
OGDC 223.50 Increased By ▲ 0.24 (0.11%)
PAEL 44.30 Increased By ▲ 0.80 (1.84%)
PIBTL 9.01 Decreased By ▼ -0.06 (-0.66%)
PPL 194.00 Decreased By ▼ -4.24 (-2.14%)
PRL 43.50 Increased By ▲ 1.26 (2.98%)
PTC 26.62 Decreased By ▼ -0.77 (-2.81%)
SEARL 107.00 Decreased By ▼ -3.08 (-2.8%)
TELE 10.14 Decreased By ▼ -0.38 (-3.61%)
TOMCL 35.95 Decreased By ▼ -0.67 (-1.83%)
TPLP 14.58 Decreased By ▼ -0.37 (-2.47%)
TREET 25.98 Decreased By ▼ -0.55 (-2.07%)
TRG 67.40 Decreased By ▼ -1.45 (-2.11%)
UNITY 33.59 Decreased By ▼ -0.60 (-1.75%)
WTL 1.73 Decreased By ▼ -0.06 (-3.35%)
BR100 12,397 Increased By 33.3 (0.27%)
BR30 37,347 Decreased By -871.2 (-2.28%)
KSE100 117,587 Increased By 467.3 (0.4%)
KSE30 37,065 Increased By 128 (0.35%)

K-Electric continues its effort to educate the young leaders of tomorrow and hosted Bahria University Karachi's students at one of their power plants located in Korangi. These students and faculty members visited Korangi's Combined Cycle Power Plant (CCPP 220 MW) which was part of a knowledge sharing platform engaging these young engineering students.
According to K-Electric's press statement the purpose of the visit was to help out students of the Electrical Engineering Department to have a better understanding of the practical aspect of the theory that they studied during their curriculum. KE spokesperson added "The students were given a brief about safety induction and history of the Korangi Combined Cycle Power Plant. This was followed by visits to various electrical installations, control room and monitoring areas and we as a responsible corporate entity believe that we have to give back to our society which is part of our work ethic".
The faculty members appreciated the time and effort that KE was putting in for the benefit of students. The faculty members also showed interest in initiating a long-term collaboration with K-Electric in order to better facilitate their passing out engineering graduates.-PR

Copyright Business Recorder, 2016

Comments

Comments are closed.