AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 127.04 No Change ▼ 0.00 (0%)
BOP 6.67 No Change ▼ 0.00 (0%)
CNERGY 4.51 No Change ▼ 0.00 (0%)
DCL 8.55 No Change ▼ 0.00 (0%)
DFML 41.44 No Change ▼ 0.00 (0%)
DGKC 86.85 No Change ▼ 0.00 (0%)
FCCL 32.28 No Change ▼ 0.00 (0%)
FFBL 64.80 No Change ▼ 0.00 (0%)
FFL 10.25 No Change ▼ 0.00 (0%)
HUBC 109.57 No Change ▼ 0.00 (0%)
HUMNL 14.68 No Change ▼ 0.00 (0%)
KEL 5.05 No Change ▼ 0.00 (0%)
KOSM 7.46 No Change ▼ 0.00 (0%)
MLCF 41.38 No Change ▼ 0.00 (0%)
NBP 60.41 No Change ▼ 0.00 (0%)
OGDC 190.10 No Change ▼ 0.00 (0%)
PAEL 27.83 No Change ▼ 0.00 (0%)
PIBTL 7.83 No Change ▼ 0.00 (0%)
PPL 150.06 No Change ▼ 0.00 (0%)
PRL 26.88 No Change ▼ 0.00 (0%)
PTC 16.07 No Change ▼ 0.00 (0%)
SEARL 86.00 No Change ▼ 0.00 (0%)
TELE 7.71 No Change ▼ 0.00 (0%)
TOMCL 35.41 No Change ▼ 0.00 (0%)
TPLP 8.12 No Change ▼ 0.00 (0%)
TREET 16.41 No Change ▼ 0.00 (0%)
TRG 53.29 No Change ▼ 0.00 (0%)
UNITY 26.16 No Change ▼ 0.00 (0%)
WTL 1.26 No Change ▼ 0.00 (0%)
BR100 10,010 Increased By 126.5 (1.28%)
BR30 31,023 Increased By 422.5 (1.38%)
KSE100 94,192 Increased By 836.5 (0.9%)
KSE30 29,201 Increased By 270.2 (0.93%)

Faisalabad Electric Supply Company (FESCO) and Pinggao Group inked an agreement of US $8.50 million for the up-gradation of four 66-KV into 132-KV Grid Stations. These Grid Stations would be completed on Turn-Key basis and completion of Grids would be helpful to strengthen the transmission system. According to details, a Chinese delegation of Pinggao Group, headed by General Manager Xu Xiafoei visited the FESCO headquarters.
GM Pingaao Group and GM Operation FESCO Masood Salahaudin signed an agreement for the up-gradation of four Grid Station of 66KV capacity into 132KV. The Grid Station nominated for up-gradations are included 66-KV Garh Mahraja, 18-Hazari, Rakh Digran and Kala Bagh. Pinggao Group would provide the services in field of Procurement of Design, Supply and Installation for conversion of Grid Stations. This project is funded by Asian Development Bank.
GM Operation Masoos Salahaudin told that on the special directives of the CEO FESCO Rashid Ahmed Aslam, the Grid Stations of the remote are being converted on modern technology which would not helpful to provide better services to the consumers but also stabilise the power distribution system. Chief Engineer PMU Sheikh Jahangir briefed about the salient feature of this project. The foreign delegation lauded the hospitality of FESCO.

Copyright Business Recorder, 2016

Comments

Comments are closed.