AGL 38.00 Decreased By ▼ -0.31 (-0.81%)
AIRLINK 136.69 Decreased By ▼ -4.71 (-3.33%)
BOP 5.42 Decreased By ▼ -0.22 (-3.9%)
CNERGY 3.83 Decreased By ▼ -0.04 (-1.03%)
DCL 7.59 Increased By ▲ 0.03 (0.4%)
DFML 46.05 Decreased By ▼ -1.35 (-2.85%)
DGKC 80.35 Increased By ▲ 0.60 (0.75%)
FCCL 28.03 Increased By ▲ 0.59 (2.15%)
FFBL 55.21 Increased By ▲ 0.36 (0.66%)
FFL 8.58 Decreased By ▼ -0.02 (-0.23%)
HUBC 112.65 Decreased By ▼ -0.86 (-0.76%)
HUMNL 12.33 Increased By ▲ 1.13 (10.09%)
KEL 3.85 Decreased By ▼ -0.14 (-3.51%)
KOSM 8.07 Decreased By ▼ -0.47 (-5.5%)
MLCF 35.11 Increased By ▲ 0.11 (0.31%)
NBP 66.00 Increased By ▲ 2.20 (3.45%)
OGDC 171.16 Increased By ▲ 1.76 (1.04%)
PAEL 25.18 No Change ▼ 0.00 (0%)
PIBTL 6.20 Increased By ▲ 0.31 (5.26%)
PPL 132.85 Increased By ▲ 7.10 (5.65%)
PRL 24.40 Decreased By ▼ -0.39 (-1.57%)
PTC 14.52 Increased By ▲ 1.26 (9.5%)
SEARL 58.95 Increased By ▲ 1.50 (2.61%)
TELE 7.09 Decreased By ▼ -0.03 (-0.42%)
TOMCL 35.00 No Change ▼ 0.00 (0%)
TPLP 8.09 Increased By ▲ 0.64 (8.59%)
TREET 14.30 Decreased By ▼ -0.02 (-0.14%)
TRG 45.59 Decreased By ▼ -0.95 (-2.04%)
UNITY 25.99 Decreased By ▼ -0.19 (-0.73%)
WTL 1.20 No Change ▼ 0.00 (0%)
BR100 9,084 Decreased By -6.9 (-0.08%)
BR30 27,631 Increased By 252.1 (0.92%)
KSE100 85,453 Decreased By -216.1 (-0.25%)
KSE30 27,149 Decreased By -67.3 (-0.25%)

Spokesman of the Ministry of Water and Power has strongly rebutted a statement from IPPs forum carried in a section of print media that circular debt is Rs 665 billion which clearly shows a lack of understanding and authentic data to comment on such a sensitive issue. He said that IPPs during last financial year have been paid more than 100% of their billed amounts.
He said that as an example HUBCO Power Company which is a plant on lower efficiency despite being an outages due to its poor maintenance and plant age, has been paid more than 100% of its billed non-fuel invoices during the previous year. The same plant on its commitments for coal conversion of existing plant which were made as an actionable item during the circular debt clearance and commitments on attaining financial close as part of the CPEC projects were not met.
The Spokesman noted that IPPs in general have not been meeting their contractual requirements on their part eg maintenance of fuel oil stock etc. To bring in more transparency into the system, heat rate testing and performance audit of IPPs was proposed which has been declined by the IPPs stating that they are not liable to the audit under the agreement signed with the Power Purchaser.
The Spokesman added that the IPP''s forum''s statements as appeared in the print media also failed to capture the efforts that have been made in developing and re-enforcing the existing transmission and distribution infrastructure to make them capable of additional power flows that are projected for the year 2018 by introduction of new power plants under public sector, CPEC and other initiatives, to eliminate the load shedding in the same year.
The Spokesman said the present government after taking office adopted a long term strategy to stabilise the power sector which is critical to restoring macroeconomic stability and enhancing economic growth. The government developed a comprehensive power plan to support the current and future energy needs of the country by addressing power sectors chronic problems in governance, liquidity, regulation, infrastructures and generation enhancement. This entire plan has been put in place with the requisite initiatives taken up in the most transparent and systematic manner.
The Spokesman said the policies that have been put in place have started showing positive results and the improved efficiency indices are proof of the same. To introduce liquidity for the sector payment of Rs 480 billion was made in June, 2013 to first ease off the liquidity crunch being faced by the sectorial entities specially IPPs, oil and gas entities. The purpose of this first action was to create liquidity in the sector so that other policy actions can be put in place. The policy actions set forth have resulted in improved recovery ratios of 94.5%, record high during the last 10 years and reduction in losses to 17.9% also lowest over the same period of time. The reforms also included a greater transparency and public disclosures of all financial transaction in the power sector which are independent of any personnel follow up or individual influence. In addition by utilising the most efficient power plant, strict adherence to economic merit order, not only resulted in improved liquidity of the sector but also limited the growth of circular debt which stands at about Rs 329 billion.

Copyright Business Recorder, 2016

Comments

Comments are closed.