AIRLINK 196.38 Increased By ▲ 4.54 (2.37%)
BOP 10.11 Increased By ▲ 0.24 (2.43%)
CNERGY 7.75 Increased By ▲ 0.08 (1.04%)
FCCL 38.10 Increased By ▲ 0.24 (0.63%)
FFL 15.74 Decreased By ▼ -0.02 (-0.13%)
FLYNG 24.54 Decreased By ▼ -0.77 (-3.04%)
HUBC 130.38 Increased By ▲ 0.21 (0.16%)
HUMNL 13.73 Increased By ▲ 0.14 (1.03%)
KEL 4.60 Decreased By ▼ -0.07 (-1.5%)
KOSM 6.19 Decreased By ▼ -0.02 (-0.32%)
MLCF 44.85 Increased By ▲ 0.56 (1.26%)
OGDC 206.51 Decreased By ▼ -0.36 (-0.17%)
PACE 6.58 Increased By ▲ 0.02 (0.3%)
PAEL 39.77 Decreased By ▼ -0.78 (-1.92%)
PIAHCLA 17.20 Decreased By ▼ -0.39 (-2.22%)
PIBTL 7.99 Decreased By ▼ -0.08 (-0.99%)
POWER 9.20 Decreased By ▼ -0.04 (-0.43%)
PPL 178.91 Increased By ▲ 0.35 (0.2%)
PRL 38.93 Decreased By ▼ -0.15 (-0.38%)
PTC 24.31 Increased By ▲ 0.17 (0.7%)
SEARL 109.27 Increased By ▲ 1.42 (1.32%)
SILK 1.00 Increased By ▲ 0.03 (3.09%)
SSGC 37.75 Decreased By ▼ -1.36 (-3.48%)
SYM 18.83 Decreased By ▼ -0.29 (-1.52%)
TELE 8.53 Decreased By ▼ -0.07 (-0.81%)
TPLP 12.14 Decreased By ▼ -0.23 (-1.86%)
TRG 64.76 Decreased By ▼ -1.25 (-1.89%)
WAVESAPP 12.11 Decreased By ▼ -0.67 (-5.24%)
WTL 1.64 Decreased By ▼ -0.06 (-3.53%)
YOUW 3.87 Decreased By ▼ -0.08 (-2.03%)
BR100 12,000 Increased By 69.2 (0.58%)
BR30 35,548 Decreased By -112 (-0.31%)
KSE100 114,256 Increased By 1049.3 (0.93%)
KSE30 35,870 Increased By 304.3 (0.86%)
Pakistan

New pipelines being installed to provide uninterrupted gas supply

BAHAWALPUR: Regional Manager Sui Northern Gas Pipeline, Malik Bashir Ahmad has said that steps are being taken to en
Published November 2, 2018

BAHAWALPUR: Regional Manager Sui Northern Gas Pipeline, Malik Bashir Ahmad has said that steps are being taken to ensure uninterrupted supply of gas in the city.

According to Malik Bashir, the new gas pipeline of 49 kilometers long and 16-inch diameter would replace 11-inch diameter pipeline from Khairpur Daha to Bahawalpur which would help in smooth transmission of gas supply.

He said that with the installation of new pipeline, complaints related to low pressure or load shedding of gas during winter seasons would be overcome.

He informed that 8-inch diameter pipeline is being replaced with 14-inch diameter pipeline from Bhatta No 1 to Lari Adda via Model Town B and Model Town C with a cost of Rs 80 million.

The new pipelines are being installed throughout the city due to which line losses would be mitigated and gas would be supplied with full pressure, he maintained.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed.