AGL 40.00 Decreased By ▼ -0.21 (-0.52%)
AIRLINK 127.25 Decreased By ▼ -0.39 (-0.31%)
BOP 6.74 Increased By ▲ 0.07 (1.05%)
CNERGY 4.51 Increased By ▲ 0.06 (1.35%)
DCL 8.71 Decreased By ▼ -0.02 (-0.23%)
DFML 41.50 Increased By ▲ 0.34 (0.83%)
DGKC 85.65 Decreased By ▼ -0.46 (-0.53%)
FCCL 33.01 Increased By ▲ 0.45 (1.38%)
FFBL 64.10 Decreased By ▼ -0.28 (-0.43%)
FFL 11.74 Increased By ▲ 0.13 (1.12%)
HUBC 111.85 Decreased By ▼ -0.61 (-0.54%)
HUMNL 15.00 Increased By ▲ 0.19 (1.28%)
KEL 5.23 Increased By ▲ 0.19 (3.77%)
KOSM 7.68 Increased By ▲ 0.32 (4.35%)
MLCF 40.24 Decreased By ▼ -0.09 (-0.22%)
NBP 61.12 Increased By ▲ 0.04 (0.07%)
OGDC 193.69 Decreased By ▼ -0.49 (-0.25%)
PAEL 26.76 Decreased By ▼ -0.15 (-0.56%)
PIBTL 7.41 Increased By ▲ 0.13 (1.79%)
PPL 153.85 Increased By ▲ 1.17 (0.77%)
PRL 26.22 No Change ▼ 0.00 (0%)
PTC 17.13 Increased By ▲ 0.99 (6.13%)
SEARL 85.25 Decreased By ▼ -0.45 (-0.53%)
TELE 7.66 Decreased By ▼ -0.01 (-0.13%)
TOMCL 34.57 Decreased By ▼ -1.90 (-5.21%)
TPLP 8.68 Decreased By ▼ -0.11 (-1.25%)
TREET 16.98 Increased By ▲ 0.14 (0.83%)
TRG 63.10 Increased By ▲ 0.36 (0.57%)
UNITY 27.60 Decreased By ▼ -0.60 (-2.13%)
WTL 1.29 Decreased By ▼ -0.05 (-3.73%)
BR100 10,107 Increased By 21.5 (0.21%)
BR30 31,212 Increased By 42.2 (0.14%)
KSE100 94,893 Increased By 129.1 (0.14%)
KSE30 29,432 Increased By 22.3 (0.08%)

Ministry of Energy (Power Division and Petroleum Division) has reportedly prepared an interim plan on conversion of 6052MW power plants-Gencos and IPPs-from furnace oil into Liquefied Natural Gas (LNG) by the end of 2019, well-informed sources told Business Recorder. On September 6, 2017, the plan was submitted to the Cabinet Committee on Energy (CCoE) presided over by Prime Minister, Shahid Khaqan Abbasi.
However, the CCoE deferred the plan on the request of Petroleum Division as an additional analysis was required to finalise figures, the sources added. According to an estimate, Pakistan could save $6-8 billion in four years by running Bhikki-type plant on RLNG in comparison to the current furnace oil-based power generation.
Power Division has to prepare the interim plan in close co-ordination and consultation with Petroleum Division which is responsible for sharing data, facts and figures relating to LNG import, and pricing vis-à-vis furnace oil.
The Petroleum Division argues that RLNG is the cheaper source of electricity generation and is advocating a ban on the consumption of furnace oil and diesel in power plants. Power Division updated the CCoE in its last meeting and the Prime Minister, who also holds the portfolio of Energy Ministry, directed that a consolidated interim report may be submitted to the CCoE in its next meeting, the sources continued.
"Power Division has prepared a report in co-ordination with the Petroleum Division which will be tabled in the forthcoming CCoE meeting," the sources maintained. Power Division, sources said, is still verifying some facts/figures provided by the Petroleum Division so that a comprehensive report is submitted to the forum which would account for an informed decision being taken. "It's a very complicated subject and until complete data is made available, it is very difficult to make any projection. Availability of gas and price are major issues. Should we factor in today's LNG prices or in the three coming years? The future prices are only projections and they require complete simulation but Pakistan does not have the capacity to analyse. It will take a lot discussions and deliberations and then a decision will be taken at the highest level as it will not be an easy decision," said a top official.
He further stated that there are several "known unknowns" like pricing, availability and infrastructure for availability of gas and its transportation, adding that it is too early to make any guess. He said debate is necessary on this issue even after the report is submitted to the CCoE. According to the fuel efficiency comparison made by the Petroleum Division, the cost of consuming RLNG in Bhikki power plant stood at 97% lower than the cost of furnace oil used in Muzaffargarh thermal power station. Similarly, the cost of RLNG is 83 per cent less than the cost of high-speed diesel being consumed in Saif power plant.
At present, hydroelectric power has a share of 34 per cent in power generation mix, furnace oil 29%, locally produced natural gas 19 per cent, LNG 8 per cent and renewable and nuclear energy 5 per cent each. However, in 2018, when power production is expected to go up to 33,124 megawatts, the share of hydroelectric power will be 30 per cent, furnace oil 18 per cent, LNG 16%, local natural gas 12 per cent, imported coal 10 per cent, renewable energy 8 per cent, nuclear power 4% and local coal 2 per cent.

Comments

Comments are closed.