AGL 38.54 Increased By ▲ 0.97 (2.58%)
AIRLINK 129.50 Decreased By ▼ -3.00 (-2.26%)
BOP 5.61 Decreased By ▼ -0.03 (-0.53%)
CNERGY 3.86 Increased By ▲ 0.09 (2.39%)
DCL 8.73 Decreased By ▼ -0.14 (-1.58%)
DFML 41.76 Increased By ▲ 0.76 (1.85%)
DGKC 88.30 Decreased By ▼ -1.86 (-2.06%)
FCCL 35.00 Decreased By ▼ -0.08 (-0.23%)
FFBL 67.35 Increased By ▲ 0.85 (1.28%)
FFL 10.61 Increased By ▲ 0.46 (4.53%)
HUBC 108.76 Increased By ▲ 2.36 (2.22%)
HUMNL 14.66 Increased By ▲ 1.26 (9.4%)
KEL 4.75 Decreased By ▼ -0.11 (-2.26%)
KOSM 6.95 Increased By ▲ 0.10 (1.46%)
MLCF 41.65 Decreased By ▼ -0.15 (-0.36%)
NBP 59.60 Increased By ▲ 1.02 (1.74%)
OGDC 183.00 Increased By ▲ 1.75 (0.97%)
PAEL 26.25 Increased By ▲ 0.55 (2.14%)
PIBTL 5.97 Increased By ▲ 0.14 (2.4%)
PPL 146.70 Decreased By ▼ -1.70 (-1.15%)
PRL 23.61 Increased By ▲ 0.39 (1.68%)
PTC 16.56 Increased By ▲ 1.32 (8.66%)
SEARL 68.30 Decreased By ▼ -0.49 (-0.71%)
TELE 7.23 Decreased By ▼ -0.01 (-0.14%)
TOMCL 35.95 Decreased By ▼ -0.05 (-0.14%)
TPLP 7.85 Increased By ▲ 0.45 (6.08%)
TREET 14.20 Decreased By ▼ -0.04 (-0.28%)
TRG 50.45 Decreased By ▼ -0.40 (-0.79%)
UNITY 26.75 Increased By ▲ 0.35 (1.33%)
WTL 1.21 No Change ▼ 0.00 (0%)
BR100 9,806 Increased By 37.8 (0.39%)
BR30 29,678 Increased By 278.1 (0.95%)
KSE100 92,304 Increased By 366.3 (0.4%)
KSE30 28,840 Increased By 96.6 (0.34%)

The commissioning of Pakistan's second LNG terminal represents a significant step forward for our country's energy security and for the global energy sector. This project is proof that Pakistan is building a safe and secure future for our children. This terminal will increase the country's LNG regasification capacity to 1.2bcf and go a long way towards fulfilling the government's vision of ensuring continuous and affordable energy to the people and to crucial sectors of our economy. This project is a testament to the highest standards of probity, fairness, and transparency. I congratulate everyone involved in bringing this mega project to life.
Mr. Sikandar Sultan Raja, Federal Secretary, Petroleum Division, Ministry of Energy
It is with immense pleasure that we, FOTCO, announce the successful completion of the RLNG high-pressure pipeline and measurement system for Pakistan's second LNG terminal. The FOTCO pipeline will relay RLNG from the PGPC jetty to the delivery point on the national gas grid through a 1.3-kilometer subsea pipeline section, a 4-kilometer trestle-mounted section, and a 7-kilometer onshore and underground section. FOTCO feels very proud to be an integral part of this energy infrastructure project, which is of significant national importance. The pipeline has an inherent design capacity of 1.2bcfd; it will therefore, also be available for the transmission of additional RLNG volumes from PGPL's upcoming second LNG import terminal.
Lt. Gen. Khalid Nawaz Khan, Hi (M) (Retired), Managing Director and Chairman, FOTCO
Port Qasim Authority congratulates PGPC on the completion of its LNG import terminal. This is the country's second LNG terminal. The first, also located at Port Qasim, was commissioned in March 2015. The port's strategic location allows it to serve as a hub for Pakistan's economic growth, and with these two terminals - and the others planned at Port Qasim - PQA is fulfilling its potential as a vital and unparalleled growth driver for the country. Mr. Agha Jan Akhtar, Chairman, Port Qasim Authority

Comments

Comments are closed.