AGL 41.50 Increased By ▲ 2.96 (7.68%)
AIRLINK 128.00 Decreased By ▼ -1.50 (-1.16%)
BOP 6.26 Increased By ▲ 0.65 (11.59%)
CNERGY 4.13 Increased By ▲ 0.27 (6.99%)
DCL 8.44 Decreased By ▼ -0.29 (-3.32%)
DFML 40.69 Decreased By ▼ -1.07 (-2.56%)
DGKC 87.90 Decreased By ▼ -0.40 (-0.45%)
FCCL 34.10 Decreased By ▼ -0.90 (-2.57%)
FFBL 66.33 Decreased By ▼ -1.02 (-1.51%)
FFL 10.56 Decreased By ▼ -0.05 (-0.47%)
HUBC 108.70 Decreased By ▼ -0.06 (-0.06%)
HUMNL 14.46 Decreased By ▼ -0.20 (-1.36%)
KEL 4.65 Decreased By ▼ -0.10 (-2.11%)
KOSM 7.33 Increased By ▲ 0.38 (5.47%)
MLCF 42.72 Increased By ▲ 1.07 (2.57%)
NBP 60.84 Increased By ▲ 1.24 (2.08%)
OGDC 178.97 Decreased By ▼ -4.03 (-2.2%)
PAEL 25.70 Decreased By ▼ -0.55 (-2.1%)
PIBTL 6.06 Increased By ▲ 0.09 (1.51%)
PPL 146.15 Decreased By ▼ -0.55 (-0.37%)
PRL 24.91 Increased By ▲ 1.30 (5.51%)
PTC 16.14 Decreased By ▼ -0.42 (-2.54%)
SEARL 70.20 Increased By ▲ 1.90 (2.78%)
TELE 7.22 Decreased By ▼ -0.01 (-0.14%)
TOMCL 36.20 Increased By ▲ 0.25 (0.7%)
TPLP 7.84 Decreased By ▼ -0.01 (-0.13%)
TREET 15.59 Increased By ▲ 1.39 (9.79%)
TRG 50.36 Decreased By ▼ -0.09 (-0.18%)
UNITY 26.90 Increased By ▲ 0.15 (0.56%)
WTL 1.24 Increased By ▲ 0.03 (2.48%)
BR100 9,793 Decreased By -12.8 (-0.13%)
BR30 29,604 Decreased By -74.4 (-0.25%)
KSE100 92,021 Decreased By -282.9 (-0.31%)
KSE30 28,665 Decreased By -175.5 (-0.61%)

A meeting of the Executive Committee of National Economic Council on Friday approved 14 development projects of energy, communication and social sectors, etc to the tune of over Rs 204 billion. The meeting presided over by Prime Minister Shahid Khaqan Abbasi approved construction of new 220kv Guddu-Sibbi single circuit transmission line for improvement of power supply system in south areas at a total rationalized cost of Rs 8.366 billion, 500 kv Lahore North Substation along with associated transmission lines at a total rationalized cost of Rs 20.732 billion and evacuation of power from 1410MW Terbela 5th Extension hydro power project at a total rationalized cost of Rs 4.14 billion.
The meeting also approved evacuation of power from 1224 MW wind power project at Jhimpir cluster at a total rationalized cost of Rs 10.752 billion.
The ECNEC approved Prime Minister's Laptop Scheme (Phase-III) at a total revised cost of Rs 21.335 billion. The Prime Minister directed HEC to prepare 'Laptop-for-all Program' that shall provide laptops to all eligible students and extension of Water Resources for Faisalabad City (Phase-II) project at a total rationalized cost of Rs 14.636 billion.
The meeting also approved Punjab Intermediate Cities Improvement Investment Program in Sahiwal and Sialkot at a total rationalized cost of Rs 26.325 billion. The meeting also approved award of 3,000 Allama Muhammad Iqbal Scholarships to Afghan students by HEC at a total rationalized cost of Rs 7.352 billion. The Prime Minister directed HEC to complete the project within 3 years instead of 5 years ie 1000 scholarships per year.
Rehabilitation/up-gradation and widening of Quetta-Dhadher Section of N-65 (118.322km) at a total rationalized cost of Rs 7.115 billion was also approved by the ECNEC as well as construction for improvement and widening of Chitral- Ayun-Bumborate Road (48km) at a total rationalized cost of Rs 4.6 billion. The Prime Minister directed the KP government to ensure cultural preservation of the Kalash tribe in collaboration with civil society and non-governmental organizations.
The meeting approved design, tendering assistance and construction of Malakand Tunnel project at a total revised cost of Rs 16.554 billion, procurement / manufacturing of 820 high capacity bogie freight wagons and 230 passenger coaches for Pakistan Railways at a total rationalized cost of Rs 31.194 billion, procurement/construction of 6 Maritime Patrol Vessels (MPVs) for Pakistan Maritime Security Agency at a revised cost of Rs 16.28 billion as well as construction of Garuk Storage Dam, District Kharan, Balochistan, at a total rationalized cost of Rs 10.511 billion and establishment of Combined Effluent Treatment Plants for industrial areas of Karachi, including laying of interceptor sewers, at a total cost of Rs 11.799 billion.

Comments

Comments are closed.