AIRLINK 191.54 Decreased By ▼ -21.28 (-10%)
BOP 10.23 Decreased By ▼ -0.02 (-0.2%)
CNERGY 6.69 Decreased By ▼ -0.31 (-4.43%)
FCCL 33.02 Decreased By ▼ -0.45 (-1.34%)
FFL 16.60 Decreased By ▼ -1.04 (-5.9%)
FLYNG 22.45 Increased By ▲ 0.63 (2.89%)
HUBC 126.60 Decreased By ▼ -2.51 (-1.94%)
HUMNL 13.83 Decreased By ▼ -0.03 (-0.22%)
KEL 4.79 Decreased By ▼ -0.07 (-1.44%)
KOSM 6.35 Decreased By ▼ -0.58 (-8.37%)
MLCF 42.10 Decreased By ▼ -1.53 (-3.51%)
OGDC 213.01 Increased By ▲ 0.06 (0.03%)
PACE 7.05 Decreased By ▼ -0.17 (-2.35%)
PAEL 40.30 Decreased By ▼ -0.87 (-2.11%)
PIAHCLA 16.85 Increased By ▲ 0.02 (0.12%)
PIBTL 8.25 Decreased By ▼ -0.38 (-4.4%)
POWER 8.85 Increased By ▲ 0.04 (0.45%)
PPL 182.89 Decreased By ▼ -0.14 (-0.08%)
PRL 38.10 Decreased By ▼ -1.53 (-3.86%)
PTC 23.90 Decreased By ▼ -0.83 (-3.36%)
SEARL 93.50 Decreased By ▼ -4.51 (-4.6%)
SILK 1.00 Decreased By ▼ -0.01 (-0.99%)
SSGC 39.85 Decreased By ▼ -1.88 (-4.51%)
SYM 18.44 Decreased By ▼ -0.42 (-2.23%)
TELE 8.66 Decreased By ▼ -0.34 (-3.78%)
TPLP 12.05 Decreased By ▼ -0.35 (-2.82%)
TRG 64.50 Decreased By ▼ -1.18 (-1.8%)
WAVESAPP 10.50 Decreased By ▼ -0.48 (-4.37%)
WTL 1.78 Decreased By ▼ -0.01 (-0.56%)
YOUW 3.96 Decreased By ▼ -0.07 (-1.74%)
BR100 11,697 Decreased By -168.8 (-1.42%)
BR30 35,252 Decreased By -445.3 (-1.25%)
KSE100 112,638 Decreased By -1510.2 (-1.32%)
KSE30 35,458 Decreased By -494 (-1.37%)

A infrastructure failure linked to Pakistan GasPort, the country's second liquefied natural gas (LNG) import project, is expected to take around 10 days to repair, prompting multiple shipments to be cancelled or diverted, trade sources said.
On top of the two cargoes traders believe have already been cancelled or diverted away from the terminal, Pakistan is in talks with suppliers to potentially delay, divert or declare force majeure on deliveries until the problem is fixed, the sources said.
That would release added supply into Asian spot markets with a potentially bearish price impact. The problem, linked to a pipeline blast or a gas leak, occurred on Tuesday, several trade and industry sources said. It occurred as LNG converted back into natural gas onboard a floating import terminal was pumped through pipelines to the shore, two industry sources said. It remains unclear if additional fixes to infrastructure will be needed that might delay the terminal's restart, they said.

Comments

Comments are closed.