AIRLINK 195.89 Increased By ▲ 2.33 (1.2%)
BOP 10.07 Increased By ▲ 0.12 (1.21%)
CNERGY 7.85 Decreased By ▼ -0.08 (-1.01%)
FCCL 40.01 Decreased By ▼ -0.64 (-1.57%)
FFL 17.01 Increased By ▲ 0.15 (0.89%)
FLYNG 27.15 Decreased By ▼ -0.60 (-2.16%)
HUBC 133.50 Increased By ▲ 0.92 (0.69%)
HUMNL 14.15 Increased By ▲ 0.26 (1.87%)
KEL 4.67 Increased By ▲ 0.07 (1.52%)
KOSM 6.69 Increased By ▲ 0.07 (1.06%)
MLCF 47.18 Decreased By ▼ -0.42 (-0.88%)
OGDC 215.01 Increased By ▲ 1.10 (0.51%)
PACE 6.97 Increased By ▲ 0.04 (0.58%)
PAEL 41.81 Increased By ▲ 0.57 (1.38%)
PIAHCLA 17.20 Increased By ▲ 0.05 (0.29%)
PIBTL 8.52 Increased By ▲ 0.11 (1.31%)
POWER 9.67 Increased By ▲ 0.03 (0.31%)
PPL 184.20 Increased By ▲ 1.85 (1.01%)
PRL 42.90 Increased By ▲ 0.94 (2.24%)
PTC 25.15 Increased By ▲ 0.25 (1%)
SEARL 109.65 Increased By ▲ 2.81 (2.63%)
SILK 1.01 Increased By ▲ 0.02 (2.02%)
SSGC 44.11 Increased By ▲ 4.01 (10%)
SYM 17.80 Increased By ▲ 0.33 (1.89%)
TELE 8.99 Increased By ▲ 0.15 (1.7%)
TPLP 13.00 Increased By ▲ 0.25 (1.96%)
TRG 67.49 Increased By ▲ 0.54 (0.81%)
WAVESAPP 11.68 Increased By ▲ 0.35 (3.09%)
WTL 1.82 Increased By ▲ 0.03 (1.68%)
YOUW 3.99 Decreased By ▼ -0.08 (-1.97%)
BR100 12,223 Increased By 178.5 (1.48%)
BR30 36,950 Increased By 370.2 (1.01%)
KSE100 115,297 Increased By 1259 (1.1%)
KSE30 36,278 Increased By 483.6 (1.35%)

A infrastructure failure linked to Pakistan GasPort, the country''s second liquefied natural gas (LNG) import project, is expected to take around 10 days to repair, prompting multiple shipments to be cancelled or diverted, trade sources said.
On top of the two cargoes traders believe have already been cancelled or diverted away from the terminal, Pakistan is in talks with suppliers to potentially delay, divert or declare force majeure on deliveries until the problem is fixed, the sources said.
That would release added supply into Asian spot markets with a potentially bearish price impact. The problem, linked to a pipeline blast or a gas leak, occurred on Tuesday, several trade and industry sources said. It occurred as LNG converted back into natural gas onboard a floating import terminal was pumped through pipelines to the shore, two industry sources said. It remains unclear if additional fixes to infrastructure will be needed that might delay the terminal''s restart, they said.

Comments

Comments are closed.