AIRLINK 201.40 Increased By ▲ 7.84 (4.05%)
BOP 10.19 Increased By ▲ 0.24 (2.41%)
CNERGY 7.63 Decreased By ▼ -0.30 (-3.78%)
FCCL 40.04 Decreased By ▼ -0.61 (-1.5%)
FFL 16.81 Decreased By ▼ -0.05 (-0.3%)
FLYNG 26.75 Decreased By ▼ -1.00 (-3.6%)
HUBC 132.46 Decreased By ▼ -0.12 (-0.09%)
HUMNL 13.90 Increased By ▲ 0.01 (0.07%)
KEL 4.66 Increased By ▲ 0.06 (1.3%)
KOSM 6.60 Decreased By ▼ -0.02 (-0.3%)
MLCF 46.79 Decreased By ▼ -0.81 (-1.7%)
OGDC 212.56 Decreased By ▼ -1.35 (-0.63%)
PACE 6.90 Decreased By ▼ -0.03 (-0.43%)
PAEL 41.37 Increased By ▲ 0.13 (0.32%)
PIAHCLA 17.00 Decreased By ▼ -0.15 (-0.87%)
PIBTL 8.12 Decreased By ▼ -0.29 (-3.45%)
POWER 9.43 Decreased By ▼ -0.21 (-2.18%)
PPL 181.49 Decreased By ▼ -0.86 (-0.47%)
PRL 41.69 Decreased By ▼ -0.27 (-0.64%)
PTC 24.75 Decreased By ▼ -0.15 (-0.6%)
SEARL 111.40 Increased By ▲ 4.56 (4.27%)
SILK 0.99 No Change ▼ 0.00 (0%)
SSGC 44.00 Increased By ▲ 3.90 (9.73%)
SYM 18.87 Increased By ▲ 1.40 (8.01%)
TELE 8.86 Increased By ▲ 0.02 (0.23%)
TPLP 12.95 Increased By ▲ 0.20 (1.57%)
TRG 67.50 Increased By ▲ 0.55 (0.82%)
WAVESAPP 11.40 Increased By ▲ 0.07 (0.62%)
WTL 1.79 No Change ▼ 0.00 (0%)
YOUW 3.99 Decreased By ▼ -0.08 (-1.97%)
BR100 12,187 Increased By 141.8 (1.18%)
BR30 36,636 Increased By 55.5 (0.15%)
KSE100 114,887 Increased By 849.3 (0.74%)
KSE30 36,109 Increased By 314.2 (0.88%)

National Engineering Services Pakistan (NESPAK) private limited attained another milestone in the hydropower sector by winning a project titled "409 MW Torcamp Godubar Hydropower Project" through competitive bidding. Pakhtunkhwa Energy Development Organization (PEDO) entrusted the Project to a joint venture of NESPAK (Lead Firm), FICHTNER GmbH & Co. KG, Germany (Foreign JV partner) in association with TRS (Pvt.) Limited, Lahore. Dr Tahir M. Hayat, Managing Director NESPAK along with Zafar Aman (Project Manager), Chief Engineer, GT&GE Division represented NESPAK at the contract signing ceremony held at PEDO House in Peshawar.
According to the spokesperson of the NESPAK the Project is located in Chitral District of Khyber Pakhtunkhwa. The scope of work includes feasibility study, detailed engineering design, preparation of tender documents and PC-I. The duration of the project is 24 months.
It is also an honor for NESPAK that the Company has been rendering engineering consultancy services for various projects of national importance like Orange Line Metro Train Project in Lahore, Neelum Jhelum Hydroelectric Power Project and RLNG-based Combined Cycle Power Projects in Punjab.
On the overseas front, NESPAK has won the Raising Wala Dam Project in Jordan, Rural Access and Mobility Project II in Nigeria and High Voltage Projects in Saudi Arabia.

Copyright Business Recorder, 2018

Comments

Comments are closed.