AIRLINK 191.54 Decreased By ▼ -21.28 (-10%)
BOP 10.23 Decreased By ▼ -0.02 (-0.2%)
CNERGY 6.69 Decreased By ▼ -0.31 (-4.43%)
FCCL 33.02 Decreased By ▼ -0.45 (-1.34%)
FFL 16.60 Decreased By ▼ -1.04 (-5.9%)
FLYNG 22.45 Increased By ▲ 0.63 (2.89%)
HUBC 126.60 Decreased By ▼ -2.51 (-1.94%)
HUMNL 13.83 Decreased By ▼ -0.03 (-0.22%)
KEL 4.79 Decreased By ▼ -0.07 (-1.44%)
KOSM 6.35 Decreased By ▼ -0.58 (-8.37%)
MLCF 42.10 Decreased By ▼ -1.53 (-3.51%)
OGDC 213.01 Increased By ▲ 0.06 (0.03%)
PACE 7.05 Decreased By ▼ -0.17 (-2.35%)
PAEL 40.30 Decreased By ▼ -0.87 (-2.11%)
PIAHCLA 16.85 Increased By ▲ 0.02 (0.12%)
PIBTL 8.25 Decreased By ▼ -0.38 (-4.4%)
POWER 8.85 Increased By ▲ 0.04 (0.45%)
PPL 182.89 Decreased By ▼ -0.14 (-0.08%)
PRL 38.10 Decreased By ▼ -1.53 (-3.86%)
PTC 23.90 Decreased By ▼ -0.83 (-3.36%)
SEARL 93.50 Decreased By ▼ -4.51 (-4.6%)
SILK 1.00 Decreased By ▼ -0.01 (-0.99%)
SSGC 39.85 Decreased By ▼ -1.88 (-4.51%)
SYM 18.44 Decreased By ▼ -0.42 (-2.23%)
TELE 8.66 Decreased By ▼ -0.34 (-3.78%)
TPLP 12.05 Decreased By ▼ -0.35 (-2.82%)
TRG 64.50 Decreased By ▼ -1.18 (-1.8%)
WAVESAPP 10.50 Decreased By ▼ -0.48 (-4.37%)
WTL 1.78 Decreased By ▼ -0.01 (-0.56%)
YOUW 3.96 Decreased By ▼ -0.07 (-1.74%)
BR100 11,697 Decreased By -168.8 (-1.42%)
BR30 35,252 Decreased By -445.3 (-1.25%)
KSE100 112,638 Decreased By -1510.2 (-1.32%)
KSE30 35,458 Decreased By -494 (-1.37%)

Prime Minister Shahid Khaqan Abbasi on Saturday inaugurated 1410 MW Tarbela 4th extension hydropower project. President Azad Jammu & Kashmir Sardar Masood Khan, Governor Khyber Pakhtunkhwa Iqbal Zafar Jhagra, Minister for Water Resources Syed Javed Ali Shah, Minister of State for Information Maryum Aurangzeb and Chinese Ambassador Yao Jing accompanied the Prime Minister.
First unit of 470 MW will be commissioned today, while as two more units each with equal power generating capacity will be online before the advent of summer this year. Commissioning of Tarbela 4th Extension Hydropower Project is yet another historic milestone achieved by the government to add 1410 MW in the national grid.
The T-4 project will play a pivotal role in balancing energy mix of the country and stabilizing prices of electricity for a long span in future with an attractive economic rate of return of more than 30 percent and annual cost sale of $300 million to national exchequer.
Tarbela Dam is located on the Indus River about 100 km northwest of Islamabad. The T-4 project is located within premises of existing Tarbela Dam Project. Tarbela Dam Project, completed in 1976, has provision of 5 tunnels, four on Left Bank and one on Right Bank. Tunnels 1-3 have installed capacity of 3,478 MW with average annual energy generation of 15-16 billion units.
The T-4 project will generate 3.84 billion units annually, equivalent of burning of 1 million ton of furnace oil. Newly installed units of T-4 project are more efficient and it is expected to have 10 -15% more energy through these units.

Copyright Business Recorder, 2018

Comments

Comments are closed.