AIRLINK 193.56 Decreased By ▼ -1.27 (-0.65%)
BOP 9.95 Increased By ▲ 0.14 (1.43%)
CNERGY 7.93 Increased By ▲ 0.57 (7.74%)
FCCL 40.65 Increased By ▲ 2.07 (5.37%)
FFL 16.86 Increased By ▲ 0.41 (2.49%)
FLYNG 27.75 Increased By ▲ 0.21 (0.76%)
HUBC 132.58 Increased By ▲ 0.83 (0.63%)
HUMNL 13.89 Increased By ▲ 0.03 (0.22%)
KEL 4.60 Decreased By ▼ -0.06 (-1.29%)
KOSM 6.62 Decreased By ▼ -0.04 (-0.6%)
MLCF 47.60 Increased By ▲ 2.21 (4.87%)
OGDC 213.91 Decreased By ▼ -0.08 (-0.04%)
PACE 6.93 Increased By ▲ 0.07 (1.02%)
PAEL 41.24 Increased By ▲ 1.18 (2.95%)
PIAHCLA 17.15 Increased By ▲ 0.36 (2.14%)
PIBTL 8.41 Increased By ▲ 0.09 (1.08%)
POWER 9.64 Increased By ▲ 0.21 (2.23%)
PPL 182.35 Increased By ▲ 0.16 (0.09%)
PRL 41.96 Increased By ▲ 0.13 (0.31%)
PTC 24.90 Increased By ▲ 0.34 (1.38%)
SEARL 106.84 Increased By ▲ 4.31 (4.2%)
SILK 0.99 Decreased By ▼ -0.01 (-1%)
SSGC 40.10 Increased By ▲ 0.66 (1.67%)
SYM 17.47 Increased By ▲ 0.14 (0.81%)
TELE 8.84 Increased By ▲ 0.08 (0.91%)
TPLP 12.75 No Change ▼ 0.00 (0%)
TRG 66.95 Increased By ▲ 1.55 (2.37%)
WAVESAPP 11.33 Increased By ▲ 0.22 (1.98%)
WTL 1.79 Increased By ▲ 0.09 (5.29%)
YOUW 4.07 Increased By ▲ 0.13 (3.3%)
BR100 12,045 Increased By 70.8 (0.59%)
BR30 36,580 Increased By 433.6 (1.2%)
KSE100 114,038 Increased By 594.4 (0.52%)
KSE30 35,794 Increased By 159 (0.45%)

National Engineering Services Pakistan (Pvt) Limited has won the Raising Waleh Dam Project in the Kingdom of Jordan in a joint venture with an international consultancy firm after a tough competition. NESPAK scope of services included design review and construction supervision for the project costing Rs 36,223 million (US 348 million dollars). According to the spokesperson the project has been awarded by the Ministry of Water and Irrigation, Jordan and it will be completed in three years.
NESPAK Managing Director Dr Tahir M Hayat has congratulated the concerned staff on this outstanding achievement and asked them to work diligently for completing the assignment in time. As per details, the project is located in the Madaba Governorate and aimed restoring the original environmental state of the Waleh Valley. The project aims at raising the walls of the dam by 15 metres to prevent it from overflowing as it reaches its full capacity almost every winter. Besides, the project carries significant environmental and tourist dimensions. Under the project, the storage capacity of the dam will increase from the current 9.6 million cubic metres (mcm) to 26.3mcm, allowing it to collect more rainwater, which implies better recharging of aquifers. Currently, millions of cubic metres of water are wasted in uncollected runoff almost every winter. The additional water will be used to provide Madaba Governorate, 30km southwest of Amman, with more drinking water.
In addition, the project seeks to increase the flow of the stream in the Waleh Valley and therefore support tourism development in the area.
It is also an honour for NESPAK that the company has been rendering engineering consultancy services for various projects in Pakistan and abroad. At the nation level, it is providing services for Orange Line Metro Train Project in Lahore, Neelum Jhelum Hydroelectric Power Project and RLNG-based Combined Cycle Power Projects in Punjab. On the overseas front, NESPAK has been engaged in providing engineering consultancy services for projects in Saudi Arabia, Qatar, Oman and Afghanistan.

Copyright Business Recorder, 2018

Comments

Comments are closed.