AGL 40.74 Increased By ▲ 0.71 (1.77%)
AIRLINK 128.34 Increased By ▲ 0.64 (0.5%)
BOP 6.68 Increased By ▲ 0.07 (1.06%)
CNERGY 4.54 Decreased By ▼ -0.06 (-1.3%)
DCL 9.18 Increased By ▲ 0.39 (4.44%)
DFML 41.70 Increased By ▲ 0.12 (0.29%)
DGKC 87.00 Increased By ▲ 1.21 (1.41%)
FCCL 32.68 Increased By ▲ 0.19 (0.58%)
FFBL 64.56 Increased By ▲ 0.53 (0.83%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 112.49 Increased By ▲ 1.72 (1.55%)
HUMNL 14.95 Decreased By ▼ -0.12 (-0.8%)
KEL 5.03 Increased By ▲ 0.15 (3.07%)
KOSM 7.30 Decreased By ▼ -0.15 (-2.01%)
MLCF 40.70 Increased By ▲ 0.18 (0.44%)
NBP 61.60 Increased By ▲ 0.55 (0.9%)
OGDC 196.50 Increased By ▲ 1.63 (0.84%)
PAEL 27.56 Increased By ▲ 0.05 (0.18%)
PIBTL 7.71 Decreased By ▼ -0.10 (-1.28%)
PPL 154.20 Increased By ▲ 1.67 (1.09%)
PRL 26.87 Increased By ▲ 0.29 (1.09%)
PTC 16.40 Increased By ▲ 0.14 (0.86%)
SEARL 83.88 Decreased By ▼ -0.26 (-0.31%)
TELE 7.84 Decreased By ▼ -0.12 (-1.51%)
TOMCL 36.45 Decreased By ▼ -0.15 (-0.41%)
TPLP 8.93 Increased By ▲ 0.27 (3.12%)
TREET 17.10 Decreased By ▼ -0.56 (-3.17%)
TRG 59.20 Increased By ▲ 0.58 (0.99%)
UNITY 27.90 Increased By ▲ 1.04 (3.87%)
WTL 1.33 Decreased By ▼ -0.05 (-3.62%)
BR100 10,000 No Change 0 (0%)
BR30 31,002 No Change 0 (0%)
KSE100 94,960 Increased By 768 (0.82%)
KSE30 29,500 Increased By 298.4 (1.02%)

London's new Crossrail train line, the biggest infrastructure project in Europe which was set to operate through the capital's heart from December, has been postponed until late 2019, its chief executive said Friday. The Elizabeth Line, decades in the planning and making, and set to add 10 percent to central London's creaking rail capacity, will now open in the third quarter of 2019, Crossrail boss Simon Wright announced.
"We have made huge progress with the delivery of this incredible project but we need further time to complete the testing of the new railway," he said in a statement.
The 73-mile (118-kilometre) east-west railway line, with two branches at either end, is costing £15.4 billion ($20 billion, 17 billion euros) to build.
It will bring an extra 1.5 million people to within 45 minutes of central London and more than 200 million passengers are expected to use it every year.
"The revised schedule is needed to complete the final infrastructure and extensive testing required to ensure the Elizabeth Line opens as a safe and reliable railway," according to Crossrail.

Copyright Agence France-Presse, 2018

Comments

Comments are closed.