AGL 39.52 Decreased By ▼ -0.48 (-1.2%)
AIRLINK 129.30 Increased By ▲ 0.24 (0.19%)
BOP 6.77 Increased By ▲ 0.02 (0.3%)
CNERGY 4.71 Increased By ▲ 0.22 (4.9%)
DCL 8.54 Decreased By ▼ -0.01 (-0.12%)
DFML 41.22 Increased By ▲ 0.40 (0.98%)
DGKC 81.30 Increased By ▲ 0.34 (0.42%)
FCCL 32.84 Increased By ▲ 0.07 (0.21%)
FFBL 74.95 Increased By ▲ 0.52 (0.7%)
FFL 11.82 Increased By ▲ 0.08 (0.68%)
HUBC 110.10 Increased By ▲ 0.52 (0.47%)
HUMNL 14.25 Increased By ▲ 0.50 (3.64%)
KEL 5.28 Decreased By ▼ -0.03 (-0.56%)
KOSM 7.70 Decreased By ▼ -0.02 (-0.26%)
MLCF 38.64 Increased By ▲ 0.04 (0.1%)
NBP 65.20 Increased By ▲ 1.69 (2.66%)
OGDC 194.00 Decreased By ▼ -0.69 (-0.35%)
PAEL 25.73 Increased By ▲ 0.02 (0.08%)
PIBTL 7.39 No Change ▼ 0.00 (0%)
PPL 153.40 Decreased By ▼ -2.05 (-1.32%)
PRL 25.63 Decreased By ▼ -0.16 (-0.62%)
PTC 17.51 Increased By ▲ 0.01 (0.06%)
SEARL 79.59 Increased By ▲ 0.94 (1.2%)
TELE 7.83 Decreased By ▼ -0.03 (-0.38%)
TOMCL 33.60 Decreased By ▼ -0.13 (-0.39%)
TPLP 8.54 Increased By ▲ 0.14 (1.67%)
TREET 16.16 Decreased By ▼ -0.11 (-0.68%)
TRG 57.88 Decreased By ▼ -0.34 (-0.58%)
UNITY 27.68 Increased By ▲ 0.19 (0.69%)
WTL 1.39 No Change ▼ 0.00 (0%)
BR100 10,604 Increased By 158.7 (1.52%)
BR30 31,216 Increased By 26.2 (0.08%)
KSE100 98,979 Increased By 1180.8 (1.21%)
KSE30 30,957 Increased By 476.8 (1.56%)

Wide ranging transfers and postings of officers working in BPS-19,18,17 are made in National Highway Authority (NHA). Such officers remained posted on the same post for a period of 5 to 10 years. The sole objective of these countrywide transfers/postings is to promote good governance and ensure transparency in functioning of the Authority.
The step will also help terminate monopoly of officers who remained posted on the same post for long. To this effect, the NHA has also chalked out policy of maximum three years tenure of posting on same post. These measures will eventually prepare ground to further improve the performance of the authority and timely and quality completion of NHA schemes will be ensured, says a press release issued here on Monday. According to the details, Project Director (KKH) NHA, Gilgit Mehboob Wali Khan is post as general manager (in own pay & scale(OPS) Jaglot-Skardu Road Project while Director Asad Khurshid Malik is posted as GM (OPS) Construction at NHA, Lahore.
Likewise Director (Contract Administration) Muhammad Jehanzeb Mumtaz Khan Niazi is posted as Director (RAMS) NHA, HQ & Director (P&CA) Muhammad Azam is posted Director (Revenue-ROW) NHA, HQ. Director NHA Kallar Kahar Samiullah Chattha is posted as Director (P&CA) NHA, HQ. Deputy Director (Engr) Nand Kumar Soofi is posted as Director (OPS) Design NHA, HQ and Atta-ul-Mohsin DD (Design) is transferred to NHA D.G.Khan office. Aftabullah Babar is posted as Project Director (Western- Corridor, Pindi Gheb to Hakla at NHA Tarnol office. Mariam Mumtaz Butt Director LM&IS is given the look after charge of Director (Resettlement/Social).
Likewise DD Muhammad Azam is posted as Director (OPS) (B&A) at NHA, HQ, while Hafiz Khurram Rashid is posted as Director (Internal Audit) NHA, HQ. Zulfiqar Ahmad Abbasi DD (Finance) NHA, Abbottabad is posted as DD (Accounts) NHA, HQ, and Tariq Hussain Shah is posted as DD Finance NHA, HQ. Irfan Rafique is posted as DD (Accounts) and Irfanullah Jan is posted as DD (Accounts) Motorways NHA, Kallar Kahar. AD (Engr) Rana Muhammad Nadeem is posted as DD (OPS) Design NHA, HQ, Farheen Shafaat is posted as AD (Design) while Farah Bashir is posted as AD (Design-Quantity Surveys) NHA, HQ. Muhammad Rizwan Nayim is posted as AD (RAMS-I), Imtiaz Khan is posted as Deputy Chief Operating Officer (OPS) (Lowari Tunnel), Safeer Ahmed Khan is post as AD (Maint) NHA, Peshawar, Murad Ali Khan AD (Maint) NHA Batkhela, Sehrish Shakeel Syed AD (Maint) Karachi, Niaz Hussain Khawar AD (Maint) Hyderabad, Irfan Ahmad Shaikh is posted as AD (Construction) NHA Sukkur Office.-PR

Copyright Business Recorder, 2019

Comments

Comments are closed.