AIRLINK 189.36 Increased By ▲ 1.33 (0.71%)
BOP 11.10 Decreased By ▼ -0.76 (-6.41%)
CNERGY 7.28 Decreased By ▼ -0.26 (-3.45%)
FCCL 36.65 Decreased By ▼ -1.14 (-3.02%)
FFL 14.95 Decreased By ▼ -0.29 (-1.9%)
FLYNG 26.19 Increased By ▲ 0.66 (2.59%)
HUBC 130.89 Increased By ▲ 0.74 (0.57%)
HUMNL 13.47 Decreased By ▼ -0.14 (-1.03%)
KEL 4.28 Decreased By ▼ -0.07 (-1.61%)
KOSM 6.08 Decreased By ▼ -0.09 (-1.46%)
MLCF 45.94 Increased By ▲ 0.26 (0.57%)
OGDC 201.86 Decreased By ▼ -4.57 (-2.21%)
PACE 6.12 Decreased By ▼ -0.26 (-4.08%)
PAEL 38.36 Decreased By ▼ -1.95 (-4.84%)
PIAHCLA 16.73 Decreased By ▼ -0.22 (-1.3%)
PIBTL 7.94 Decreased By ▼ -0.09 (-1.12%)
POWER 9.86 Decreased By ▼ -0.17 (-1.69%)
PPL 173.46 Decreased By ▼ -5.38 (-3.01%)
PRL 34.73 Decreased By ▼ -1.63 (-4.48%)
PTC 23.95 Decreased By ▼ -0.44 (-1.8%)
SEARL 101.74 Decreased By ▼ -1.42 (-1.38%)
SILK 1.07 No Change ▼ 0.00 (0%)
SSGC 32.70 Decreased By ▼ -3.54 (-9.77%)
SYM 17.93 Decreased By ▼ -0.30 (-1.65%)
TELE 8.14 Decreased By ▼ -0.24 (-2.86%)
TPLP 12.02 Decreased By ▼ -0.14 (-1.15%)
TRG 67.40 Increased By ▲ 0.07 (0.1%)
WAVESAPP 11.80 Decreased By ▼ -0.21 (-1.75%)
WTL 1.52 Decreased By ▼ -0.05 (-3.18%)
YOUW 3.90 Increased By ▲ 0.01 (0.26%)
BR100 11,819 Decreased By -87.9 (-0.74%)
BR30 35,000 Decreased By -554.1 (-1.56%)
KSE100 112,085 Decreased By -478.8 (-0.43%)
KSE30 34,946 Decreased By -148 (-0.42%)

As dismantling process of existing old Burma Bridge at Lehtrar Road is in progress, Capital Development Authority (CDA) chairman has issued instructions that proper stocktaking of debris may be taken so that valuable material could be auctioned at later stage.
In this context, the member engineering and director general works have been directed to carry out the needed survey of the debris and proper list of dismantled material of the bridge may be prepared. It has been further directed that debris including steel works should not be left unattended and arrangements be also made for preserving the valuable materials. It has been instructed that after categorising useful material and rubble of the bridge, proper stock register be maintained so that the valuable material could be preserved and then be auctioned while rubble could be removed from the site and construction of the bridge could be started at the earliest.
Instructions have been further issued that as monsoon rains have been started, therefore, while carrying out dismantling of the bridge, it must be ensured that rubble may not affect the water flow in the nullah. The member engineering and director general works have also been directed to speed up the dismantling work and complete it at the earliest so that construction of long awaited Burma Bridge could be started.

Copyright Business Recorder, 2019

Comments

Comments are closed.