AIRLINK 193.77 Decreased By ▼ -6.98 (-3.48%)
BOP 9.87 Decreased By ▼ -0.34 (-3.33%)
CNERGY 7.57 Decreased By ▼ -0.14 (-1.82%)
FCCL 39.41 Decreased By ▼ -0.65 (-1.62%)
FFL 16.29 Decreased By ▼ -0.52 (-3.09%)
FLYNG 25.84 Decreased By ▼ -0.81 (-3.04%)
HUBC 129.86 Decreased By ▼ -2.74 (-2.07%)
HUMNL 13.83 Decreased By ▼ -0.09 (-0.65%)
KEL 4.53 Decreased By ▼ -0.12 (-2.58%)
KOSM 6.47 Decreased By ▼ -0.12 (-1.82%)
MLCF 45.57 Decreased By ▼ -1.17 (-2.5%)
OGDC 209.11 Decreased By ▼ -3.32 (-1.56%)
PACE 6.72 Decreased By ▼ -0.18 (-2.61%)
PAEL 41.85 Increased By ▲ 0.57 (1.38%)
PIAHCLA 17.13 Increased By ▲ 0.13 (0.76%)
PIBTL 7.90 Decreased By ▼ -0.21 (-2.59%)
POWER 9.36 Decreased By ▼ -0.06 (-0.64%)
PPL 177.92 Decreased By ▼ -3.54 (-1.95%)
PRL 39.01 Decreased By ▼ -2.77 (-6.63%)
PTC 25.53 Increased By ▲ 0.83 (3.36%)
SEARL 106.73 Decreased By ▼ -5.11 (-4.57%)
SILK 0.99 Decreased By ▼ -0.01 (-1%)
SSGC 39.53 Decreased By ▼ -4.39 (-10%)
SYM 19.45 Increased By ▲ 0.47 (2.48%)
TELE 8.64 Decreased By ▼ -0.23 (-2.59%)
TPLP 12.53 Decreased By ▼ -0.39 (-3.02%)
TRG 65.34 Decreased By ▼ -2.13 (-3.16%)
WAVESAPP 11.15 Decreased By ▼ -0.27 (-2.36%)
WTL 1.73 Decreased By ▼ -0.06 (-3.35%)
YOUW 3.94 Decreased By ▼ -0.05 (-1.25%)
BR100 12,030 Decreased By -140.3 (-1.15%)
BR30 35,812 Decreased By -776.7 (-2.12%)
KSE100 113,520 Decreased By -1360.2 (-1.18%)
KSE30 35,651 Decreased By -473.7 (-1.31%)

As dismantling process of existing old Burma Bridge at Lehtrar Road is in progress, Capital Development Authority (CDA) chairman has issued instructions that proper stocktaking of debris may be taken so that valuable material could be auctioned at later stage.
In this context, the member engineering and director general works have been directed to carry out the needed survey of the debris and proper list of dismantled material of the bridge may be prepared. It has been further directed that debris including steel works should not be left unattended and arrangements be also made for preserving the valuable materials. It has been instructed that after categorising useful material and rubble of the bridge, proper stock register be maintained so that the valuable material could be preserved and then be auctioned while rubble could be removed from the site and construction of the bridge could be started at the earliest.
Instructions have been further issued that as monsoon rains have been started, therefore, while carrying out dismantling of the bridge, it must be ensured that rubble may not affect the water flow in the nullah. The member engineering and director general works have also been directed to speed up the dismantling work and complete it at the earliest so that construction of long awaited Burma Bridge could be started.

Copyright Business Recorder, 2019

Comments

Comments are closed.