AIRLINK 204.00 Increased By ▲ 3.10 (1.54%)
BOP 10.05 Decreased By ▼ -0.10 (-0.99%)
CNERGY 6.92 Increased By ▲ 0.04 (0.58%)
FCCL 34.85 Increased By ▲ 0.76 (2.23%)
FFL 17.28 Increased By ▲ 0.30 (1.77%)
FLYNG 24.61 Increased By ▲ 0.57 (2.37%)
HUBC 137.49 Increased By ▲ 5.79 (4.4%)
HUMNL 13.84 Increased By ▲ 0.08 (0.58%)
KEL 4.90 Increased By ▲ 0.09 (1.87%)
KOSM 6.68 Decreased By ▼ -0.02 (-0.3%)
MLCF 44.20 Increased By ▲ 0.87 (2.01%)
OGDC 221.70 Increased By ▲ 2.95 (1.35%)
PACE 7.07 Increased By ▲ 0.09 (1.29%)
PAEL 43.00 Increased By ▲ 1.46 (3.51%)
PIAHCLA 17.12 Increased By ▲ 0.05 (0.29%)
PIBTL 8.60 Decreased By ▼ -0.05 (-0.58%)
POWER 8.99 Decreased By ▼ -0.12 (-1.32%)
PPL 190.00 Increased By ▲ 2.88 (1.54%)
PRL 43.00 Increased By ▲ 0.94 (2.23%)
PTC 25.00 Increased By ▲ 0.01 (0.04%)
SEARL 106.20 Increased By ▲ 5.90 (5.88%)
SILK 1.02 Increased By ▲ 0.01 (0.99%)
SSGC 42.75 Increased By ▲ 0.42 (0.99%)
SYM 18.35 Increased By ▲ 0.37 (2.06%)
TELE 9.17 Increased By ▲ 0.06 (0.66%)
TPLP 13.18 Increased By ▲ 0.25 (1.93%)
TRG 67.98 Decreased By ▼ -0.37 (-0.54%)
WAVESAPP 10.26 Decreased By ▼ -0.03 (-0.29%)
WTL 1.87 Increased By ▲ 0.01 (0.54%)
YOUW 4.15 Increased By ▲ 0.02 (0.48%)
BR100 12,137 Increased By 188.4 (1.58%)
BR30 37,146 Increased By 778.3 (2.14%)
KSE100 115,272 Increased By 1435.3 (1.26%)
KSE30 36,311 Increased By 549.3 (1.54%)

KARACHI: Sindh Chief Minister Syed Murad Ali Shah during his visit to different districts of the city has directed transport department to complete BRTS Abdul Sattar Edhi Line (Orange Line) by removing all the bottlenecks such as shifting of utilities that it could be completed in time.

He was accompanied by Minister Local Government Saeed Ghani and Sindh Minister Transport Awais Shah, said a statement on Sunday.

The chief minister went to Orangi where structure of BRT Abdula Statar Edhi was still incomplete.

Minister Transport Awais Shah told the chief minister that there were some issues such as the utilities of PTCL, K-Electric, KWSB and SSGC have been shifted but still they have not made their new connections so that stopped work could be completed.

He added that there were some leakages of waterlines and overflow of sewerage line.

He said mostly people of Orangi and garbage vehicles dump their garbage along and inside BRT corridor.

The chief minister directed Minister Local Government Saeed Ghani to resolve the issues related to water board and garbage lifting.

"I am very clear, the Municipal Commissioners who cannot deliver, remove them and post good officers there," he told Minister Local Government.

BRT Abdul Sattar Edhi Line is 3.88 kilometers, including four bus stations and one bus terminal. The project was started in April 2017. The cost of the project is Rs 643.35 million. To a question of the chief minister, the Transport minister said that land for construction of bus Terminal from local transporters and police have been acquired.

He directed the minister to expedite the work on the project so that it could be connected with the Green Line at Board office.

Copyright APP (Associated Press of Pakistan), 2019

Comments

Comments are closed.