AIRLINK 193.50 Decreased By ▼ -1.51 (-0.77%)
BOP 9.64 Decreased By ▼ -0.13 (-1.33%)
CNERGY 7.53 Increased By ▲ 0.17 (2.31%)
FCCL 37.70 Decreased By ▼ -1.07 (-2.76%)
FFL 15.60 Increased By ▲ 0.01 (0.06%)
FLYNG 25.59 Increased By ▲ 0.18 (0.71%)
HUBC 127.07 Decreased By ▼ -1.55 (-1.21%)
HUMNL 13.50 Decreased By ▼ -0.31 (-2.24%)
KEL 4.58 Increased By ▲ 0.09 (2%)
KOSM 6.10 Decreased By ▼ -0.20 (-3.17%)
MLCF 43.96 Decreased By ▼ -0.83 (-1.85%)
OGDC 203.24 Decreased By ▼ -0.36 (-0.18%)
PACE 6.40 Decreased By ▼ -0.02 (-0.31%)
PAEL 40.98 Decreased By ▼ -0.15 (-0.36%)
PIAHCLA 17.49 Increased By ▲ 0.77 (4.61%)
PIBTL 7.66 Decreased By ▼ -0.02 (-0.26%)
POWER 9.08 Increased By ▲ 0.04 (0.44%)
PPL 174.25 Increased By ▲ 0.34 (0.2%)
PRL 38.07 Decreased By ▼ -1.01 (-2.58%)
PTC 24.07 Decreased By ▼ -0.97 (-3.87%)
SEARL 107.24 Decreased By ▼ -1.82 (-1.67%)
SILK 0.97 Decreased By ▼ -0.02 (-2.02%)
SSGC 36.40 Decreased By ▼ -1.74 (-4.56%)
SYM 19.04 Decreased By ▼ -0.45 (-2.31%)
TELE 8.24 Decreased By ▼ -0.12 (-1.44%)
TPLP 11.78 Decreased By ▼ -0.35 (-2.89%)
TRG 64.88 Increased By ▲ 0.09 (0.14%)
WAVESAPP 11.63 Increased By ▲ 1.06 (10.03%)
WTL 1.68 Decreased By ▼ -0.01 (-0.59%)
YOUW 3.85 Decreased By ▼ -0.02 (-0.52%)
BR100 11,765 Decreased By -123.2 (-1.04%)
BR30 34,986 Decreased By -233.6 (-0.66%)
KSE100 111,487 Decreased By -543 (-0.48%)
KSE30 34,934 Decreased By -201.5 (-0.57%)

ISLAMABAD: Pakistan has completed construction of Chashma nuclear power plant II with the cooperation of China and the plant has started to produce 300 megawatts of electricity on trial basis.

The project has been completed prior to its scheduled time in a record five year period. The power plant has also been connected to the national grid, a private TV channel reported.

The channel quoting Pakistan Atomic Energy Commission sources said that construction of two other atomic reactors Chashma-III and Chashma- IV with the Chinese assistance has also been started at Chashma. The construction of these two reactors will be completed in the next five to seven years time.

On the other hand work has started to upgrade the production capacity of the current nuclear power plants.

Copyright APP (Associated Press of Pakistan), 2011

Comments

Comments are closed.