AIRLINK 189.64 Decreased By ▼ -7.01 (-3.56%)
BOP 10.09 Decreased By ▼ -0.05 (-0.49%)
CNERGY 6.68 Decreased By ▼ -0.01 (-0.15%)
FCCL 34.14 Increased By ▲ 1.12 (3.39%)
FFL 17.09 Increased By ▲ 0.44 (2.64%)
FLYNG 23.83 Increased By ▲ 1.38 (6.15%)
HUBC 126.05 Decreased By ▼ -1.24 (-0.97%)
HUMNL 13.79 Decreased By ▼ -0.11 (-0.79%)
KEL 4.77 Increased By ▲ 0.01 (0.21%)
KOSM 6.58 Increased By ▲ 0.21 (3.3%)
MLCF 43.28 Increased By ▲ 1.06 (2.51%)
OGDC 224.96 Increased By ▲ 11.93 (5.6%)
PACE 7.38 Increased By ▲ 0.37 (5.28%)
PAEL 41.74 Increased By ▲ 0.87 (2.13%)
PIAHCLA 17.19 Increased By ▲ 0.37 (2.2%)
PIBTL 8.41 Increased By ▲ 0.12 (1.45%)
POWER 9.05 Increased By ▲ 0.23 (2.61%)
PPL 193.09 Increased By ▲ 9.52 (5.19%)
PRL 37.34 Decreased By ▼ -0.93 (-2.43%)
PTC 24.02 Decreased By ▼ -0.05 (-0.21%)
SEARL 94.54 Decreased By ▼ -0.57 (-0.6%)
SILK 0.99 Decreased By ▼ -0.01 (-1%)
SSGC 39.93 Decreased By ▼ -0.38 (-0.94%)
SYM 17.77 Decreased By ▼ -0.44 (-2.42%)
TELE 8.66 Decreased By ▼ -0.07 (-0.8%)
TPLP 12.39 Increased By ▲ 0.18 (1.47%)
TRG 62.65 Decreased By ▼ -1.71 (-2.66%)
WAVESAPP 10.28 Decreased By ▼ -0.16 (-1.53%)
WTL 1.75 Decreased By ▼ -0.04 (-2.23%)
YOUW 3.97 Decreased By ▼ -0.03 (-0.75%)
BR100 11,814 Increased By 90.4 (0.77%)
BR30 36,234 Increased By 874.6 (2.47%)
KSE100 113,247 Increased By 609 (0.54%)
KSE30 35,712 Increased By 253.6 (0.72%)

CNGQUETTA: Habibullah Coastal Power House Quetta has completely stopped power production after the suspension of natural gas supply to it on Saturday. In a handout issued by the Quetta Electric Supply Company (QESCO) here, after the closure of 25-MW TPS Sheikh Manda Quetta and 120-MW private Habibullah Coastal Power House, the electricity crises has been worsen in the province, power shortage by 800 MW has been reported against total demand of 1210 MW.

"Now 42 grid stations of Balochistan are receiving 400 MW of electricity," the spokesman to QESCO said. The spokesman maintained that six to eight-hour load shedding at Quetta, 14-hour at district headquarters and 18-hour in rural areas were being carried out on daily basis due to the acute shortage of electricity supply to the grid stations.    He, however, said that duration of power load management would be decreased soon after the Habibullah Coastal Power House and TPS Sheikh Manda start their production.

Copyright APP (Associated Press of Pakistan), 2011

Comments

Comments are closed.