AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 127.04 No Change ▼ 0.00 (0%)
BOP 6.67 No Change ▼ 0.00 (0%)
CNERGY 4.51 No Change ▼ 0.00 (0%)
DCL 8.55 No Change ▼ 0.00 (0%)
DFML 41.44 No Change ▼ 0.00 (0%)
DGKC 86.85 No Change ▼ 0.00 (0%)
FCCL 32.28 No Change ▼ 0.00 (0%)
FFBL 64.80 No Change ▼ 0.00 (0%)
FFL 10.25 No Change ▼ 0.00 (0%)
HUBC 109.57 No Change ▼ 0.00 (0%)
HUMNL 14.68 No Change ▼ 0.00 (0%)
KEL 5.05 No Change ▼ 0.00 (0%)
KOSM 7.46 No Change ▼ 0.00 (0%)
MLCF 41.38 No Change ▼ 0.00 (0%)
NBP 60.41 No Change ▼ 0.00 (0%)
OGDC 190.10 No Change ▼ 0.00 (0%)
PAEL 27.83 No Change ▼ 0.00 (0%)
PIBTL 7.83 No Change ▼ 0.00 (0%)
PPL 150.06 No Change ▼ 0.00 (0%)
PRL 26.88 No Change ▼ 0.00 (0%)
PTC 16.07 No Change ▼ 0.00 (0%)
SEARL 86.00 No Change ▼ 0.00 (0%)
TELE 7.71 No Change ▼ 0.00 (0%)
TOMCL 35.41 No Change ▼ 0.00 (0%)
TPLP 8.12 No Change ▼ 0.00 (0%)
TREET 16.41 No Change ▼ 0.00 (0%)
TRG 53.29 No Change ▼ 0.00 (0%)
UNITY 26.16 No Change ▼ 0.00 (0%)
WTL 1.26 No Change ▼ 0.00 (0%)
BR100 10,010 Increased By 126.5 (1.28%)
BR30 31,023 Increased By 422.5 (1.38%)
KSE100 94,192 Increased By 836.5 (0.9%)
KSE30 29,201 Increased By 270.2 (0.93%)

imageBUENOS AIRES: The construction of two hydroelectric dams in Argentina's Patagonia region has been awarded to a consortium of domestic and Chinese companies, President Cristina Kirchner announced Wednesday.

Local Electroingenieria e Hidrocuyo and China-based Gezhouba Group Company Limited secured the deal, Kirchner said.

Those losing out include Alstom (France)- Odebrecht (Brazil), Isolux (Spain), Sinohydro (China) and Hyundai (South Korea).

The dams, to be built on the Santa Cruz river, will have a production capacity of 1.740 megawatts, or 4.7 percent of national electric production.

Kirchner said the new construction would mean that the Santa Cruz river would have the second largest dam after Yacyreta, a dam located on the Parana river and jointly administered by Argentina and Paraguay.

Argentina relies heavily on the Yacyreta dam, which covers 22 percent of the country's electricity needs.

The Santa Cruz river, which extends some 385 kilometers (240 miles), originates in the Andes and flows into the Atlantic Ocean.

Argentine officials say construction, which will begin in December, will take five years and create 5,000 jobs.

The two new dams will be named after former governors of Santa Cruz state -- Jorge Cepernic and Nestor Kirchner, who was president from 2003 and 2007.

Copyright AFP (Agence France-Presse), 2013

Comments

Comments are closed.