AGL 38.20 Increased By ▲ 0.05 (0.13%)
AIRLINK 129.30 Increased By ▲ 4.23 (3.38%)
BOP 7.85 Increased By ▲ 1.00 (14.6%)
CNERGY 4.66 Increased By ▲ 0.21 (4.72%)
DCL 8.35 Increased By ▲ 0.44 (5.56%)
DFML 38.86 Increased By ▲ 1.52 (4.07%)
DGKC 82.20 Increased By ▲ 4.43 (5.7%)
FCCL 33.64 Increased By ▲ 3.06 (10.01%)
FFBL 75.75 Increased By ▲ 6.89 (10.01%)
FFL 12.83 Increased By ▲ 0.97 (8.18%)
HUBC 110.72 Increased By ▲ 6.22 (5.95%)
HUMNL 14.03 Increased By ▲ 0.54 (4%)
KEL 5.22 Increased By ▲ 0.57 (12.26%)
KOSM 7.69 Increased By ▲ 0.52 (7.25%)
MLCF 40.08 Increased By ▲ 3.64 (9.99%)
NBP 72.51 Increased By ▲ 6.59 (10%)
OGDC 189.18 Increased By ▲ 9.65 (5.38%)
PAEL 25.74 Increased By ▲ 1.31 (5.36%)
PIBTL 7.38 Increased By ▲ 0.23 (3.22%)
PPL 153.45 Increased By ▲ 9.75 (6.78%)
PRL 25.52 Increased By ▲ 1.20 (4.93%)
PTC 17.92 Increased By ▲ 1.52 (9.27%)
SEARL 82.50 Increased By ▲ 3.93 (5%)
TELE 7.63 Increased By ▲ 0.41 (5.68%)
TOMCL 32.50 Increased By ▲ 0.53 (1.66%)
TPLP 8.48 Increased By ▲ 0.35 (4.31%)
TREET 16.74 Increased By ▲ 0.61 (3.78%)
TRG 56.01 Increased By ▲ 1.35 (2.47%)
UNITY 28.85 Increased By ▲ 1.35 (4.91%)
WTL 1.34 Increased By ▲ 0.05 (3.88%)
BR100 10,659 Increased By 569.2 (5.64%)
BR30 31,331 Increased By 1822.5 (6.18%)
KSE100 99,269 Increased By 4695.1 (4.96%)
KSE30 31,032 Increased By 1587.6 (5.39%)

imageISLAMABAD: Information Minister Pervaiz Rashid has said the government is striving to exploit the vast potential of renewable energy to meet the growing energy requirements of the country.

He was speaking at a function in connection with biomass energy project in Islamabad on Friday. The project will be completed in four years with the cooperation of United Nations Industrial Development Organization.

The Minister said several wind energy projects are in the pipeline and 2500 megawatt of electricity will be generated through this source by 2015.

Similarly‚ attention is also being given to exploit the potential of solar energy.

He said Pakistan is an agriculture country and has abundant resources of biomass‚ which could be utilized to significantly meet the requirements of industrial sector hit hard by the energy crisis.

Pervaiz Rashid pointed out the country was facing shortfall of five thousand megawatt when the present government assumed the power. He said the government retired circular debt of about four hundred and eighty billion rupees‚ which increased the power generation to record 17000 megawatt.

He said steps have also been taken to remove inefficiency in the transmission system and a campaign is also continuing against those involved in gas and power theft.

The Minister said the government is also taking long term measures to ensure energy security. These measures include coal based Gaddani power project which will add 6600 megawatt of electricity to the system. Work on Neelum Jhelum hydel power project has also been accelerated and this project is now expected to be completed by 2016.

Comments

Comments are closed.