AGL 40.01 Decreased By ▼ -0.15 (-0.37%)
AIRLINK 129.70 Decreased By ▼ -2.03 (-1.54%)
BOP 6.68 Decreased By ▼ -0.01 (-0.15%)
CNERGY 4.65 Increased By ▲ 0.18 (4.03%)
DCL 8.86 Increased By ▲ 0.04 (0.45%)
DFML 41.79 Increased By ▲ 1.18 (2.91%)
DGKC 83.89 Decreased By ▼ -0.19 (-0.23%)
FCCL 32.66 Increased By ▲ 0.32 (0.99%)
FFBL 75.47 Increased By ▲ 6.86 (10%)
FFL 11.50 Increased By ▲ 0.15 (1.32%)
HUBC 110.49 Decreased By ▼ -1.27 (-1.14%)
HUMNL 14.60 Increased By ▲ 0.29 (2.03%)
KEL 5.38 Increased By ▲ 0.16 (3.07%)
KOSM 8.43 Decreased By ▼ -0.55 (-6.12%)
MLCF 39.94 Increased By ▲ 0.51 (1.29%)
NBP 60.14 Decreased By ▼ -0.15 (-0.25%)
OGDC 198.45 Increased By ▲ 3.51 (1.8%)
PAEL 26.64 Decreased By ▼ -0.05 (-0.19%)
PIBTL 7.71 Increased By ▲ 0.23 (3.07%)
PPL 157.57 Increased By ▲ 1.80 (1.16%)
PRL 26.65 Decreased By ▼ -0.03 (-0.11%)
PTC 18.35 Increased By ▲ 0.05 (0.27%)
SEARL 82.30 Decreased By ▼ -0.72 (-0.87%)
TELE 8.33 Increased By ▲ 0.10 (1.22%)
TOMCL 34.46 Decreased By ▼ -0.09 (-0.26%)
TPLP 9.00 Increased By ▲ 0.19 (2.16%)
TREET 17.30 Increased By ▲ 0.60 (3.59%)
TRG 61.29 Decreased By ▼ -1.16 (-1.86%)
UNITY 27.35 Decreased By ▼ -0.09 (-0.33%)
WTL 1.37 Increased By ▲ 0.09 (7.03%)
BR100 10,397 Increased By 210.3 (2.06%)
BR30 31,640 Increased By 303.3 (0.97%)
KSE100 97,336 Increased By 1789.9 (1.87%)
KSE30 30,187 Increased By 608.9 (2.06%)
Pakistan

SSGC taking pains to stem losses of 400 mmcfd gas

Normal 0 false false false MicrosoftInternetExplorer4 st1\:*{behavior:url(#ieooui) } /* S
Published June 16, 2011

Normal 0 false false false MicrosoftInternetExplorer4

st1\:*{behavior:url(#ieooui) }

/* Style Definitions */
table.MsoNormalTable
{mso-style-name:"Table Normal";
mso-tstyle-rowband-size:0;
mso-tstyle-colband-size:0;
mso-style-noshow:yes;
mso-style-parent:"";
mso-padding-alt:0in 5.4pt 0in 5.4pt;
mso-para-margin:0in;
mso-para-margin-bottom:.0001pt;
mso-pagination:widow-orphan;
font-size:10.0pt;
font-family:"Times New Roman";
mso-ansi-language:#0400;
mso-fareast-language:#0400;
mso-bidi-language:#0400;}

ssgcISLAMABAD: The Sui Southern Gas Company Limited (SSGC) is suffering line losses about 400 mmcfd gas, having potential to generate 2000 MW of electricity.

According to an official source 50 percent of the losses are due to leakages, while the rest can be attributed to slow meters, theft and measurement errors.

"If the situation continues to persist, the current 8 percent unaccounted for gas (UFG), the company is faced with, will rise to 11 percent by 2016," the source said.

To overcome the issue of gas losses the source while quoting the company's DMD (North), said with the assistance of a US$200 million loan from the World Bank, SSGC intends to implement a project named Natural Gas Efficiency Project for the main purpose of reducing system losses and the rising tide of UFG.

Pakistan is producing 4 bcfd of gas, but the fields are fast ageing, this figure will shrink to 2 bcfd by 2020 if adequate measures are not taken to prevent the downslide, the source said.

According to the source a large quantity of gas is used for cooking and heating purposes and that in Pakistan all gas appliances currently used have low efficiency.

In order to improve the quality of appliances, the source added, the SSGC had teamed up with PSQCA to review the designs of the appliances and force the industry to manufacture high efficiency PSQCA-approved appliances.

"If we can successfully make the manufacturers comply with PSCQA standards, savings of 40 percent can be made which means that 40 mcf of additional gas can be utilized by the power sector," the source maintained.

The source said Pakistan is sitting on top of 420 mmcfd of indigenous gas reserves that need to be immediately explored to put a leash on the aggravating energy crisis.

According to the source there is a widening demand and supply gap which calls for urgent implementation of the LNG project and that a number of private sector LNG projects in the short term can be considered on war footing including off-shore, dockside and 3rd party access.

"If we take the right direction, we can have LNG in 8 to 12 months," the source observes.

Copyright APP (Associated Press of Pakistan), 2011

Comments

Comments are closed.