AGL 38.20 Increased By ▲ 0.05 (0.13%)
AIRLINK 129.30 Increased By ▲ 4.23 (3.38%)
BOP 7.85 Increased By ▲ 1.00 (14.6%)
CNERGY 4.66 Increased By ▲ 0.21 (4.72%)
DCL 8.35 Increased By ▲ 0.44 (5.56%)
DFML 38.86 Increased By ▲ 1.52 (4.07%)
DGKC 82.20 Increased By ▲ 4.43 (5.7%)
FCCL 33.64 Increased By ▲ 3.06 (10.01%)
FFBL 75.75 Increased By ▲ 6.89 (10.01%)
FFL 12.83 Increased By ▲ 0.97 (8.18%)
HUBC 110.72 Increased By ▲ 6.22 (5.95%)
HUMNL 14.03 Increased By ▲ 0.54 (4%)
KEL 5.22 Increased By ▲ 0.57 (12.26%)
KOSM 7.69 Increased By ▲ 0.52 (7.25%)
MLCF 40.08 Increased By ▲ 3.64 (9.99%)
NBP 72.51 Increased By ▲ 6.59 (10%)
OGDC 189.18 Increased By ▲ 9.65 (5.38%)
PAEL 25.74 Increased By ▲ 1.31 (5.36%)
PIBTL 7.38 Increased By ▲ 0.23 (3.22%)
PPL 153.45 Increased By ▲ 9.75 (6.78%)
PRL 25.52 Increased By ▲ 1.20 (4.93%)
PTC 17.92 Increased By ▲ 1.52 (9.27%)
SEARL 82.50 Increased By ▲ 3.93 (5%)
TELE 7.63 Increased By ▲ 0.41 (5.68%)
TOMCL 32.50 Increased By ▲ 0.53 (1.66%)
TPLP 8.48 Increased By ▲ 0.35 (4.31%)
TREET 16.74 Increased By ▲ 0.61 (3.78%)
TRG 56.01 Increased By ▲ 1.35 (2.47%)
UNITY 28.85 Increased By ▲ 1.35 (4.91%)
WTL 1.34 Increased By ▲ 0.05 (3.88%)
BR100 10,659 Increased By 569.2 (5.64%)
BR30 31,331 Increased By 1822.5 (6.18%)
KSE100 99,269 Increased By 4695.1 (4.96%)
KSE30 31,032 Increased By 1587.6 (5.39%)

imageHYDERABAD: First downpour of monsoon over Hyderabad and suburb areas leaves water stranding on roads and streets while residents of southern Sindh had to experienced nine hour long major power breakdown since restoration of electric supply to Karachi and HESCO region.

As a result of downpour, the 450 MVA Power Transformer of 500 KV Grid Station of National Transmission and Dispatch Company Jamshoro caught fire resulting stoppage of power supply to Karachi and 12 districts of the Region of Hyderabad Electric Supply Company (HESCO), the HESCO spokesman said.

He informed that after hectic struggle, the fire of the power transformer brought under control.

According to Met Office, 22 millimetre rainfall was recorded in city areas of Hyderabad while at the Airport the rainfall was recorded as 16 millimetres.

As a result of rainfall, the low lying areas of Hyderabad City, Latifabad and Qasimabad Talukas have been submerged with rainwater and the management concerned making efforts to drain out the standing rainwater.

Later, the engineers replaced the system and restored the power supply to Karachi and HESCO Region after nine hours struggle, he said. The nine hours long power breakdown also caused the stoppage of supply of water as a result of which the people face great inconvenience particularly on the day of Jummat-ul-Wida.

Comments

Comments are closed.