AGL 38.20 Increased By ▲ 0.21 (0.55%)
AIRLINK 211.50 Decreased By ▼ -4.03 (-1.87%)
BOP 9.48 Decreased By ▼ -0.32 (-3.27%)
CNERGY 6.52 Decreased By ▼ -0.27 (-3.98%)
DCL 9.00 Decreased By ▼ -0.17 (-1.85%)
DFML 38.23 Decreased By ▼ -0.73 (-1.87%)
DGKC 96.86 Decreased By ▼ -3.39 (-3.38%)
FCCL 36.55 Decreased By ▼ -0.15 (-0.41%)
FFBL 88.94 No Change ▼ 0.00 (0%)
FFL 14.98 Increased By ▲ 0.49 (3.38%)
HUBC 131.00 Decreased By ▼ -3.13 (-2.33%)
HUMNL 13.44 Decreased By ▼ -0.19 (-1.39%)
KEL 5.51 Decreased By ▼ -0.18 (-3.16%)
KOSM 6.87 Decreased By ▼ -0.45 (-6.15%)
MLCF 44.90 Decreased By ▼ -0.97 (-2.11%)
NBP 59.34 Decreased By ▼ -1.94 (-3.17%)
OGDC 230.00 Decreased By ▼ -2.59 (-1.11%)
PAEL 39.20 Decreased By ▼ -1.53 (-3.76%)
PIBTL 8.38 Decreased By ▼ -0.20 (-2.33%)
PPL 200.00 Decreased By ▼ -3.34 (-1.64%)
PRL 39.10 Decreased By ▼ -1.71 (-4.19%)
PTC 27.00 Decreased By ▼ -1.31 (-4.63%)
SEARL 103.32 Decreased By ▼ -5.19 (-4.78%)
TELE 8.40 Decreased By ▼ -0.34 (-3.89%)
TOMCL 35.35 Decreased By ▼ -0.48 (-1.34%)
TPLP 13.46 Decreased By ▼ -0.38 (-2.75%)
TREET 25.30 Increased By ▲ 0.92 (3.77%)
TRG 64.50 Increased By ▲ 3.35 (5.48%)
UNITY 34.90 Increased By ▲ 0.06 (0.17%)
WTL 1.77 Increased By ▲ 0.05 (2.91%)
BR100 12,110 Decreased By -137 (-1.12%)
BR30 37,723 Decreased By -662.1 (-1.72%)
KSE100 112,415 Decreased By -1509.6 (-1.33%)
KSE30 35,508 Decreased By -535.7 (-1.49%)

imageBUCHAREST: Chinese utility China General Nuclear (CGN) filed a non-binding bid to partner with Romania's state-owned nuclear power producer Nuclearelectrica to build two reactors at its site on the river Danube, the Romanian firm's manager said on Tuesday.

Nuclearelectrica had initially planned to build the two reactors, estimated to cost a combined 6 billion euros ($7.73 billion), in partnership with six European energy firms. Those firms withdrew one by one from the project between 2010 and 2013, feeling the impact of Europe's debt crisis.

The power producer has been looking for replacements ever since, and had signed several letters of intent and cooperation with Chinese energy firms.

CGN was the only prospective investor to file an offer by a Sept. 8 deadline, Nuclearelectrica manager Daniela Lulache told a news conference.

"The qualified investor fully meets the requirements both from a standpoint of technical and nuclear safety standards and for its capacity to finance such a project," Lulache said.

No financial details were given, but CGN has until Sept. 24 to file a binding bid and a price offer for a majority stake in the joint company that will build the two reactors, Lulache said.

She hopes to sign a final contract by the end of the year. Construction would take about six years.

Lulache said the Romanian government would likely have to approve price or profit guarantees for the power produced by the two reactors, similar to what Britain proposes to give to a consortium led by French state-controlled utility EDF to build two nuclear plants in Hinkley Point.

The Hinkley Point power project, in which CGN also has a stake, proposes guaranteeing a power price for the electricity it produces. In Romania the details of the guarantees have yet to be decided.

The European Commission would need to sign off on any state aid that is provided. Nuclearelectrica already has two 706 megawatt reactors, accounting for roughly a fifth of Romania's power production. They use Candu technology, from Canada's Candu Energy, owned by SNC Lavalin Group, as would the two future reactors.

Comments

Comments are closed.