AGL 40.21 Increased By ▲ 0.18 (0.45%)
AIRLINK 127.64 Decreased By ▼ -0.06 (-0.05%)
BOP 6.67 Increased By ▲ 0.06 (0.91%)
CNERGY 4.45 Decreased By ▼ -0.15 (-3.26%)
DCL 8.73 Decreased By ▼ -0.06 (-0.68%)
DFML 41.16 Decreased By ▼ -0.42 (-1.01%)
DGKC 86.11 Increased By ▲ 0.32 (0.37%)
FCCL 32.56 Increased By ▲ 0.07 (0.22%)
FFBL 64.38 Increased By ▲ 0.35 (0.55%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 112.46 Increased By ▲ 1.69 (1.53%)
HUMNL 14.81 Decreased By ▼ -0.26 (-1.73%)
KEL 5.04 Increased By ▲ 0.16 (3.28%)
KOSM 7.36 Decreased By ▼ -0.09 (-1.21%)
MLCF 40.33 Decreased By ▼ -0.19 (-0.47%)
NBP 61.08 Increased By ▲ 0.03 (0.05%)
OGDC 194.18 Decreased By ▼ -0.69 (-0.35%)
PAEL 26.91 Decreased By ▼ -0.60 (-2.18%)
PIBTL 7.28 Decreased By ▼ -0.53 (-6.79%)
PPL 152.68 Increased By ▲ 0.15 (0.1%)
PRL 26.22 Decreased By ▼ -0.36 (-1.35%)
PTC 16.14 Decreased By ▼ -0.12 (-0.74%)
SEARL 85.70 Increased By ▲ 1.56 (1.85%)
TELE 7.67 Decreased By ▼ -0.29 (-3.64%)
TOMCL 36.47 Decreased By ▼ -0.13 (-0.36%)
TPLP 8.79 Increased By ▲ 0.13 (1.5%)
TREET 16.84 Decreased By ▼ -0.82 (-4.64%)
TRG 62.74 Increased By ▲ 4.12 (7.03%)
UNITY 28.20 Increased By ▲ 1.34 (4.99%)
WTL 1.34 Decreased By ▼ -0.04 (-2.9%)
BR100 10,086 Increased By 85.5 (0.85%)
BR30 31,170 Increased By 168.1 (0.54%)
KSE100 94,764 Increased By 571.8 (0.61%)
KSE30 29,410 Increased By 209 (0.72%)

imageJAKARTA: Freeport-McMoRan Inc needs to build two Indonesian copper smelters at a cost of around $4 billion by 2020, a government official said, as talks resumed between the miner and Jakarta over the firm's future in the Southeast Asian country.

The proposal comes five months after Freeport signed a memorandum of understanding (MOU) with the Indonesian government that ended a six-month tax dispute and paved the way for the company to resume copper concentrate exports.

As part of July's MOU, the country's largest copper producer agreed to pay a $115 million "assurance bond" to develop a $2.3 billion smelter by 2017. The government is now asking Freeport to build a second one by 2020 at a cost of around $1.5 billion.

"We have asked Freeport to build another smelter in Papua that is different than the one in Gresik," Coal and Minerals Director General Sukhyar told reporters on Tuesday.

Freeport Indonesia's chief executive officer, Rozik Soetjipto, declined to comment on the Papua smelter proposal as negotiations were still ongoing.

Freeport is working with fellow US miner Newmont Mining Corp on the building of the first smelter. A location for the facility, expected to annually process 1.6 million tonnes of copper concentrate into copper cathode, has yet to be finalised.

The Papua smelter is expected to process at least 600,000 tonnes of copper concentrate per year, Sukhyar said.

"This (second smelter) is aimed at processing more of Freeport's production of (copper) concentrates after the development of underground mining," he said.

Freeport wants assurances its contract will be extended beyond 2021 before agreeing to invest more than $15 billion to turn its Grasberg complex into an underground mine after 2016.

But government officials say formal talks on renewing the contract cannot under law commence until 2019. The July MOU was seen as a way to bridge that gap and offer the assurances Freeport needs to invest in underground mining.

Copyright Reuters, 2014

Comments

Comments are closed.