AIRLINK 152.12 Decreased By ▼ -8.16 (-5.09%)
BOP 9.12 Decreased By ▼ -0.36 (-3.8%)
CNERGY 7.09 Decreased By ▼ -0.72 (-9.22%)
CPHL 82.29 Decreased By ▼ -3.82 (-4.44%)
FCCL 42.81 Decreased By ▼ -0.92 (-2.1%)
FFL 14.21 Decreased By ▼ -0.75 (-5.01%)
FLYNG 28.59 Decreased By ▼ -0.10 (-0.35%)
HUBC 131.94 Decreased By ▼ -5.18 (-3.78%)
HUMNL 12.23 Decreased By ▼ -0.22 (-1.77%)
KEL 4.00 Decreased By ▼ -0.11 (-2.68%)
KOSM 4.91 Decreased By ▼ -0.33 (-6.3%)
MLCF 67.05 Decreased By ▼ -1.87 (-2.71%)
OGDC 200.38 Decreased By ▼ -7.43 (-3.58%)
PACE 4.99 Decreased By ▼ -0.17 (-3.29%)
PAEL 41.50 Decreased By ▼ -1.70 (-3.94%)
PIAHCLA 16.22 Decreased By ▼ -0.56 (-3.34%)
PIBTL 8.42 Decreased By ▼ -0.50 (-5.61%)
POWER 13.05 Decreased By ▼ -0.43 (-3.19%)
PPL 148.60 Decreased By ▼ -8.50 (-5.41%)
PRL 27.71 Decreased By ▼ -0.88 (-3.08%)
PTC 19.46 Decreased By ▼ -1.12 (-5.44%)
SEARL 81.97 Decreased By ▼ -2.62 (-3.1%)
SSGC 37.27 Decreased By ▼ -2.06 (-5.24%)
SYM 14.38 Decreased By ▼ -0.80 (-5.27%)
TELE 6.82 Decreased By ▼ -0.21 (-2.99%)
TPLP 8.14 Decreased By ▼ -0.68 (-7.71%)
TRG 63.13 Decreased By ▼ -0.71 (-1.11%)
WAVESAPP 8.04 Decreased By ▼ -0.83 (-9.36%)
WTL 1.25 Decreased By ▼ -0.01 (-0.79%)
YOUW 3.35 Decreased By ▼ -0.19 (-5.37%)
AIRLINK 152.12 Decreased By ▼ -8.16 (-5.09%)
BOP 9.12 Decreased By ▼ -0.36 (-3.8%)
CNERGY 7.09 Decreased By ▼ -0.72 (-9.22%)
CPHL 82.29 Decreased By ▼ -3.82 (-4.44%)
FCCL 42.81 Decreased By ▼ -0.92 (-2.1%)
FFL 14.21 Decreased By ▼ -0.75 (-5.01%)
FLYNG 28.59 Decreased By ▼ -0.10 (-0.35%)
HUBC 131.94 Decreased By ▼ -5.18 (-3.78%)
HUMNL 12.23 Decreased By ▼ -0.22 (-1.77%)
KEL 4.00 Decreased By ▼ -0.11 (-2.68%)
KOSM 4.91 Decreased By ▼ -0.33 (-6.3%)
MLCF 67.05 Decreased By ▼ -1.87 (-2.71%)
OGDC 200.38 Decreased By ▼ -7.43 (-3.58%)
PACE 4.99 Decreased By ▼ -0.17 (-3.29%)
PAEL 41.50 Decreased By ▼ -1.70 (-3.94%)
PIAHCLA 16.22 Decreased By ▼ -0.56 (-3.34%)
PIBTL 8.42 Decreased By ▼ -0.50 (-5.61%)
POWER 13.05 Decreased By ▼ -0.43 (-3.19%)
PPL 148.60 Decreased By ▼ -8.50 (-5.41%)
PRL 27.71 Decreased By ▼ -0.88 (-3.08%)
PTC 19.46 Decreased By ▼ -1.12 (-5.44%)
SEARL 81.97 Decreased By ▼ -2.62 (-3.1%)
SSGC 37.27 Decreased By ▼ -2.06 (-5.24%)
SYM 14.38 Decreased By ▼ -0.80 (-5.27%)
TELE 6.82 Decreased By ▼ -0.21 (-2.99%)
TPLP 8.14 Decreased By ▼ -0.68 (-7.71%)
TRG 63.13 Decreased By ▼ -0.71 (-1.11%)
WAVESAPP 8.04 Decreased By ▼ -0.83 (-9.36%)
WTL 1.25 Decreased By ▼ -0.01 (-0.79%)
YOUW 3.35 Decreased By ▼ -0.19 (-5.37%)
BR100 11,776 Decreased By -377.8 (-3.11%)
BR30 34,410 Decreased By -1457.9 (-4.06%)
KSE100 111,327 Decreased By -3545.6 (-3.09%)
KSE30 33,993 Decreased By -1274 (-3.61%)

imageSUKKUR: Co-Chairman of PPP Asif Ali Zardari performed the foundation stone laying ceremony of two hydro power projects to be constructed on Nara and Rohri canals at a cost of 84 million dollars near here on Monday and termed it a historic day not only for Pakistan but also for the people of the areas.

Chief Minister Sindh Qaim Ali Shah was also present on the occasion. Asif Zardari said said that the ground-breaking of these two projects was a reflection of the government's resolve to achieve energy security for speedy development of the country.

"We are spending Rs 84 million dollars on this area which will provide employment to locals and help significantly in poverty alleviation", he said.

Zardari said that Nara Hydro Power project will be constructed at RD-26 of Nara Canal at a cost of 47.6 million dollars.

He appreciated the Sindh Government efforts for following the guidelines

of Benazir Bhutto for investing in power generation. "Once both

projects become operational it would create great impact on local economy," he said.

He further said that another mega project of 40 MW hydro power project will also be built at Guddu barrage.

Talking about Sukkur barrage the PPP Co-chairman said that without changing its structure, a rehabilitation study of the barrage would be conducted.

This barrage is a state of art adding that it has revolutionized the economy of the province. "It would be protected and strengthened," he added.

On the occasion, Zardari directed that these two projects should be completed within the schedule time of two and a half years.

Earlier, consultant hydro power projects, Khursheed Ahmed Jamali said that it would generate 15 MW electricity.

Talking about Rohri Hydro Power Project, he said that it would be built at RD-15 of Rohri Canal and its capacity in the peak season would be 9 MW and its construction cost would come to 36.4 million dollars.

CM Sindh Syed Qaim Ali Shah also spoke on the occasion.

Provincial Minister Sindh for Finance and Energy, Syed Murad Ali Shah, Sindh Minister for Health and Food Jam Mehtab Dahar, Syed Javed Ali Shah, MPA Syed Nasir Hussain Shah and other PPP leaders including top officials of the concerned departments also attended the ceremony.

Copyright APP (Associated Press of Pakistan), 2014

Comments

Comments are closed.