AIRLINK 200.75 Increased By ▲ 7.19 (3.71%)
BOP 10.21 Increased By ▲ 0.26 (2.61%)
CNERGY 7.71 Decreased By ▼ -0.22 (-2.77%)
FCCL 40.06 Decreased By ▼ -0.59 (-1.45%)
FFL 16.81 Decreased By ▼ -0.05 (-0.3%)
FLYNG 26.65 Decreased By ▼ -1.10 (-3.96%)
HUBC 132.60 Increased By ▲ 0.02 (0.02%)
HUMNL 13.92 Increased By ▲ 0.03 (0.22%)
KEL 4.65 Increased By ▲ 0.05 (1.09%)
KOSM 6.59 Decreased By ▼ -0.03 (-0.45%)
MLCF 46.74 Decreased By ▼ -0.86 (-1.81%)
OGDC 212.43 Decreased By ▼ -1.48 (-0.69%)
PACE 6.90 Decreased By ▼ -0.03 (-0.43%)
PAEL 41.28 Increased By ▲ 0.04 (0.1%)
PIAHCLA 17.00 Decreased By ▼ -0.15 (-0.87%)
PIBTL 8.11 Decreased By ▼ -0.30 (-3.57%)
POWER 9.42 Decreased By ▼ -0.22 (-2.28%)
PPL 181.46 Decreased By ▼ -0.89 (-0.49%)
PRL 41.78 Decreased By ▼ -0.18 (-0.43%)
PTC 24.70 Decreased By ▼ -0.20 (-0.8%)
SEARL 111.84 Increased By ▲ 5.00 (4.68%)
SILK 1.00 Increased By ▲ 0.01 (1.01%)
SSGC 43.92 Increased By ▲ 3.82 (9.53%)
SYM 18.98 Increased By ▲ 1.51 (8.64%)
TELE 8.87 Increased By ▲ 0.03 (0.34%)
TPLP 12.92 Increased By ▲ 0.17 (1.33%)
TRG 67.47 Increased By ▲ 0.52 (0.78%)
WAVESAPP 11.42 Increased By ▲ 0.09 (0.79%)
WTL 1.79 No Change ▼ 0.00 (0%)
YOUW 3.99 Decreased By ▼ -0.08 (-1.97%)
BR100 12,170 Increased By 125.6 (1.04%)
BR30 36,589 Increased By 8.6 (0.02%)
KSE100 114,880 Increased By 842.7 (0.74%)
KSE30 36,125 Increased By 330.6 (0.92%)

imageSYDNEY: Copper output from BHP Billiton's Olympic Dam mine in Australia will be cut by 60,000-70,000 tonnes this year, or more than a third of the targeted output levels, due to repair and maintenance work, the miner said on Friday.

The lower production would wipe out more than a quarter of the year's global copper surplus, estimated at 221,000 tonnes by analysts polled by Reuters, supporting metal prices that are down almost 9 percent so far this year.

In January, BHP said it expects the Olympic Dam mine to yield some 180,000 tonnes of copper in fiscal 2015, with maintenance work scheduled for September.

But electrical failure in the milling process last month prompted BHP to bring forward regular maintenance work to coincide with repairs to the mill over the next six months, the company said.

The majority of the lost production will occur in the current fiscal year ending June 30, BHP said, adding it expects the mine to return to full production by the end of September.

Copyright Reuters, 2015

Comments

Comments are closed.