AGL 38.20 Increased By ▲ 0.05 (0.13%)
AIRLINK 129.30 Increased By ▲ 4.23 (3.38%)
BOP 7.85 Increased By ▲ 1.00 (14.6%)
CNERGY 4.66 Increased By ▲ 0.21 (4.72%)
DCL 8.35 Increased By ▲ 0.44 (5.56%)
DFML 38.86 Increased By ▲ 1.52 (4.07%)
DGKC 82.20 Increased By ▲ 4.43 (5.7%)
FCCL 33.64 Increased By ▲ 3.06 (10.01%)
FFBL 75.75 Increased By ▲ 6.89 (10.01%)
FFL 12.83 Increased By ▲ 0.97 (8.18%)
HUBC 110.72 Increased By ▲ 6.22 (5.95%)
HUMNL 14.03 Increased By ▲ 0.54 (4%)
KEL 5.22 Increased By ▲ 0.57 (12.26%)
KOSM 7.69 Increased By ▲ 0.52 (7.25%)
MLCF 40.08 Increased By ▲ 3.64 (9.99%)
NBP 72.51 Increased By ▲ 6.59 (10%)
OGDC 189.18 Increased By ▲ 9.65 (5.38%)
PAEL 25.74 Increased By ▲ 1.31 (5.36%)
PIBTL 7.38 Increased By ▲ 0.23 (3.22%)
PPL 153.45 Increased By ▲ 9.75 (6.78%)
PRL 25.52 Increased By ▲ 1.20 (4.93%)
PTC 17.92 Increased By ▲ 1.52 (9.27%)
SEARL 82.50 Increased By ▲ 3.93 (5%)
TELE 7.63 Increased By ▲ 0.41 (5.68%)
TOMCL 32.50 Increased By ▲ 0.53 (1.66%)
TPLP 8.48 Increased By ▲ 0.35 (4.31%)
TREET 16.74 Increased By ▲ 0.61 (3.78%)
TRG 56.01 Increased By ▲ 1.35 (2.47%)
UNITY 28.85 Increased By ▲ 1.35 (4.91%)
WTL 1.34 Increased By ▲ 0.05 (3.88%)
BR100 10,659 Increased By 569.2 (5.64%)
BR30 31,331 Increased By 1822.5 (6.18%)
KSE100 99,269 Increased By 4695.1 (4.96%)
KSE30 31,032 Increased By 1587.6 (5.39%)

imageLAHORE: Prime Minister Muhammad Nawaz Sharif on Tuesday reviewed pace of work on 1320 MW Coal Power Project, Qadirabad, Sahiwal district.

The project consists of two plants of 660 MW each while the total cost of the project is USD 1.8 billion.

The entire investment of the project is being made by Chinese bank through the Chinese Independent Power Producers (IPPs) executing the Sahiwal Coal Power Project. The project is sprawled over 1700 acres.

The project was started six months ago and Huaneng Shandong Group China is to complete 51 percent of the project while the remaining 49 percent work will be completed by Shandong Rayi Science China.

The first 660MW plant will start power generation by December 31, 2017 and the other of 660MW by June 30, 2018.

The project also entails 9.5 kilometres transmission line of 500kv to be connected with nearby 500kva Grid Station at Yousafwala.

The project will consume 4.48 billion tonnes of coal annually to be imported from South Africa and Indonesia.

In Pakistan, the imported coal will be off-loaded at Port Qasim, Karachi from where it will be transported to Sahiwal Coal Power Plant through special train service. For this purpose, 20 locomotives are being purchased from China.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.