AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 129.00 Decreased By ▼ -0.53 (-0.41%)
BOP 6.76 Increased By ▲ 0.08 (1.2%)
CNERGY 4.50 Decreased By ▼ -0.13 (-2.81%)
DCL 8.70 Decreased By ▼ -0.24 (-2.68%)
DFML 41.00 Decreased By ▼ -0.69 (-1.66%)
DGKC 81.30 Decreased By ▼ -2.47 (-2.95%)
FCCL 32.68 Decreased By ▼ -0.09 (-0.27%)
FFBL 74.25 Decreased By ▼ -1.22 (-1.62%)
FFL 11.75 Increased By ▲ 0.28 (2.44%)
HUBC 110.03 Decreased By ▼ -0.52 (-0.47%)
HUMNL 13.80 Decreased By ▼ -0.76 (-5.22%)
KEL 5.29 Decreased By ▼ -0.10 (-1.86%)
KOSM 7.63 Decreased By ▼ -0.77 (-9.17%)
MLCF 38.35 Decreased By ▼ -1.44 (-3.62%)
NBP 63.70 Increased By ▲ 3.41 (5.66%)
OGDC 194.88 Decreased By ▼ -4.78 (-2.39%)
PAEL 25.75 Decreased By ▼ -0.90 (-3.38%)
PIBTL 7.37 Decreased By ▼ -0.29 (-3.79%)
PPL 155.74 Decreased By ▼ -2.18 (-1.38%)
PRL 25.70 Decreased By ▼ -1.03 (-3.85%)
PTC 17.56 Decreased By ▼ -0.90 (-4.88%)
SEARL 78.71 Decreased By ▼ -3.73 (-4.52%)
TELE 7.88 Decreased By ▼ -0.43 (-5.17%)
TOMCL 33.61 Decreased By ▼ -0.90 (-2.61%)
TPLP 8.41 Decreased By ▼ -0.65 (-7.17%)
TREET 16.26 Decreased By ▼ -1.21 (-6.93%)
TRG 58.60 Decreased By ▼ -2.72 (-4.44%)
UNITY 27.51 Increased By ▲ 0.08 (0.29%)
WTL 1.41 Increased By ▲ 0.03 (2.17%)
BR100 10,450 Increased By 43.4 (0.42%)
BR30 31,209 Decreased By -504.2 (-1.59%)
KSE100 97,798 Increased By 469.8 (0.48%)
KSE30 30,481 Increased By 288.3 (0.95%)
Markets

Spain bill targets 1,400 MW wind energy/year to 2020

MADRID : The Spanish government has set an annual target for installed wind energy of 1,400 megawatts between 2013 and 2
Published September 23, 2011

spain-wind-energyMADRID: The Spanish government has set an annual target for installed wind energy of 1,400 megawatts between 2013 and 2020, according to draft regulation the Industry Ministry sent to the energy sector watchdog CNE.

In the draft, to which Reuters gained access on Thursday, the ministry says the aim is to install 11,200 MW in the period to ensure that there are 35,000 MW operating in 2020.

The additional cost to the electricity system will be around 800 million euros over the eight-year period, according to the ministry's calculations.

"This does not take into account the reduction in pool prices due to the introduction of this technology," the ministry said, adding that the shortfall will be funded by electricity tariffs and will not come out of Spain's annual budget.

The draft regulation also includes changes to the remuneration system for wind power facilities. The installations will sell their energy at pool prices and will also receive a premium, but only in the event that the premium and the pool price combined falls within a minimum and maximum limit.

For 2013, the ministry has established in the draft regulation a 20 euros/MW premium, with a maximum of 80 euros/MW and minimum of 55 euros/MW.

The new regulation establishes an annual cap of 1,500 working hours to obtain the premium, but cuts to a maximum of 12 years the period during which facilities are eligible for the premium.

"Wind energy technology has reached a level of maturity which will allow it to compete with conventional technologies in the market in a very short time," the draft said.

The wind energy sector association AEE said in a statement that thousands of jobs will be lost if the new regulation is implemented.

But an Industry Ministry source said the new regulation "provides a stable system for the long term."

 

Copyright Reuters, 2011

 

Comments

Comments are closed.