AIRLINK 188.50 Decreased By ▼ -8.15 (-4.14%)
BOP 10.17 Increased By ▲ 0.03 (0.3%)
CNERGY 6.61 Decreased By ▼ -0.08 (-1.2%)
FCCL 34.03 Increased By ▲ 1.01 (3.06%)
FFL 16.60 Decreased By ▼ -0.05 (-0.3%)
FLYNG 24.16 Increased By ▲ 1.71 (7.62%)
HUBC 126.20 Decreased By ▼ -1.09 (-0.86%)
HUMNL 13.82 Decreased By ▼ -0.08 (-0.58%)
KEL 4.82 Increased By ▲ 0.06 (1.26%)
KOSM 6.50 Increased By ▲ 0.13 (2.04%)
MLCF 43.19 Increased By ▲ 0.97 (2.3%)
OGDC 213.00 Decreased By ▼ -0.03 (-0.01%)
PACE 7.30 Increased By ▲ 0.29 (4.14%)
PAEL 42.19 Increased By ▲ 1.32 (3.23%)
PIAHCLA 17.47 Increased By ▲ 0.65 (3.86%)
PIBTL 8.43 Increased By ▲ 0.14 (1.69%)
POWER 9.00 Increased By ▲ 0.18 (2.04%)
PPL 184.90 Increased By ▲ 1.33 (0.72%)
PRL 38.02 Decreased By ▼ -0.25 (-0.65%)
PTC 24.25 Increased By ▲ 0.18 (0.75%)
SEARL 94.75 Decreased By ▼ -0.36 (-0.38%)
SILK 1.00 No Change ▼ 0.00 (0%)
SSGC 39.60 Decreased By ▼ -0.71 (-1.76%)
SYM 17.89 Decreased By ▼ -0.32 (-1.76%)
TELE 8.73 No Change ▼ 0.00 (0%)
TPLP 12.50 Increased By ▲ 0.29 (2.38%)
TRG 63.90 Decreased By ▼ -0.46 (-0.71%)
WAVESAPP 10.50 Increased By ▲ 0.06 (0.57%)
WTL 1.79 No Change ▼ 0.00 (0%)
YOUW 3.98 Decreased By ▼ -0.02 (-0.5%)
BR100 11,721 Decreased By -1.9 (-0.02%)
BR30 35,442 Increased By 83 (0.23%)
KSE100 113,073 Increased By 434.6 (0.39%)
KSE30 35,576 Increased By 117.9 (0.33%)

The Karachi Port Trust (KPT) has plans in hand for the upgradation of its large flotilla of tugs, pilot boats, hopper barges and dredges.
Although the flotilla of harbour crafts is regularly upgraded to cater to the shipping requirements, the upgradation will equip Karachi port sufficiently to meet the requirements of deeper draught vessels and maintenance of a deeper channel.
According to details available here, two self-propelled split hopper barges will cost Rs 536 million.
The plans and estimates have already been approved by the KPT Board and the government.
Similarly, detailed technical proposals were obtained from Karachi Shipyard and Engineering Works (KSEW).
After approval by the KPT Chairman for consolidated cost of the work of Rs 195 million, the KSEW was asked to confirm the cost. It, however, responded with a cost of Rs 240 million.
After discussions, the KSEW quoted the final price of Rs 210 million.
Plans and estimated cost of one anchor hoist vessel have already been approved by the KPT Board.
The KPT has received approval for award of work to the consultant for preparation of specifications.

Copyright Business Recorder, 2004

Comments

Comments are closed.