AGL 38.20 Increased By ▲ 0.05 (0.13%)
AIRLINK 129.30 Increased By ▲ 4.23 (3.38%)
BOP 7.85 Increased By ▲ 1.00 (14.6%)
CNERGY 4.66 Increased By ▲ 0.21 (4.72%)
DCL 8.35 Increased By ▲ 0.44 (5.56%)
DFML 38.86 Increased By ▲ 1.52 (4.07%)
DGKC 82.20 Increased By ▲ 4.43 (5.7%)
FCCL 33.64 Increased By ▲ 3.06 (10.01%)
FFBL 75.75 Increased By ▲ 6.89 (10.01%)
FFL 12.83 Increased By ▲ 0.97 (8.18%)
HUBC 110.72 Increased By ▲ 6.22 (5.95%)
HUMNL 14.03 Increased By ▲ 0.54 (4%)
KEL 5.22 Increased By ▲ 0.57 (12.26%)
KOSM 7.69 Increased By ▲ 0.52 (7.25%)
MLCF 40.08 Increased By ▲ 3.64 (9.99%)
NBP 72.51 Increased By ▲ 6.59 (10%)
OGDC 189.18 Increased By ▲ 9.65 (5.38%)
PAEL 25.74 Increased By ▲ 1.31 (5.36%)
PIBTL 7.38 Increased By ▲ 0.23 (3.22%)
PPL 153.45 Increased By ▲ 9.75 (6.78%)
PRL 25.52 Increased By ▲ 1.20 (4.93%)
PTC 17.92 Increased By ▲ 1.52 (9.27%)
SEARL 82.50 Increased By ▲ 3.93 (5%)
TELE 7.63 Increased By ▲ 0.41 (5.68%)
TOMCL 32.50 Increased By ▲ 0.53 (1.66%)
TPLP 8.48 Increased By ▲ 0.35 (4.31%)
TREET 16.74 Increased By ▲ 0.61 (3.78%)
TRG 56.01 Increased By ▲ 1.35 (2.47%)
UNITY 28.85 Increased By ▲ 1.35 (4.91%)
WTL 1.34 Increased By ▲ 0.05 (3.88%)
BR100 10,659 Increased By 569.2 (5.64%)
BR30 31,331 Increased By 1822.5 (6.18%)
KSE100 99,269 Increased By 4695.1 (4.96%)
KSE30 31,032 Increased By 1587.6 (5.39%)

The Karachi Port Trust (KPT) has plans in hand for the upgradation of its large flotilla of tugs, pilot boats, hopper barges and dredges.
Although the flotilla of harbour crafts is regularly upgraded to cater to the shipping requirements, the upgradation will equip Karachi port sufficiently to meet the requirements of deeper draught vessels and maintenance of a deeper channel.
According to details available here, two self-propelled split hopper barges will cost Rs 536 million.
The plans and estimates have already been approved by the KPT Board and the government.
Similarly, detailed technical proposals were obtained from Karachi Shipyard and Engineering Works (KSEW).
After approval by the KPT Chairman for consolidated cost of the work of Rs 195 million, the KSEW was asked to confirm the cost. It, however, responded with a cost of Rs 240 million.
After discussions, the KSEW quoted the final price of Rs 210 million.
Plans and estimated cost of one anchor hoist vessel have already been approved by the KPT Board.
The KPT has received approval for award of work to the consultant for preparation of specifications.

Copyright Business Recorder, 2004

Comments

Comments are closed.