AIRLINK 189.64 Decreased By ▼ -7.01 (-3.56%)
BOP 10.09 Decreased By ▼ -0.05 (-0.49%)
CNERGY 6.68 Decreased By ▼ -0.01 (-0.15%)
FCCL 34.14 Increased By ▲ 1.12 (3.39%)
FFL 17.09 Increased By ▲ 0.44 (2.64%)
FLYNG 23.83 Increased By ▲ 1.38 (6.15%)
HUBC 126.05 Decreased By ▼ -1.24 (-0.97%)
HUMNL 13.79 Decreased By ▼ -0.11 (-0.79%)
KEL 4.77 Increased By ▲ 0.01 (0.21%)
KOSM 6.58 Increased By ▲ 0.21 (3.3%)
MLCF 43.28 Increased By ▲ 1.06 (2.51%)
OGDC 224.96 Increased By ▲ 11.93 (5.6%)
PACE 7.38 Increased By ▲ 0.37 (5.28%)
PAEL 41.74 Increased By ▲ 0.87 (2.13%)
PIAHCLA 17.19 Increased By ▲ 0.37 (2.2%)
PIBTL 8.41 Increased By ▲ 0.12 (1.45%)
POWER 9.05 Increased By ▲ 0.23 (2.61%)
PPL 193.09 Increased By ▲ 9.52 (5.19%)
PRL 37.34 Decreased By ▼ -0.93 (-2.43%)
PTC 24.02 Decreased By ▼ -0.05 (-0.21%)
SEARL 94.54 Decreased By ▼ -0.57 (-0.6%)
SILK 0.99 Decreased By ▼ -0.01 (-1%)
SSGC 39.93 Decreased By ▼ -0.38 (-0.94%)
SYM 17.77 Decreased By ▼ -0.44 (-2.42%)
TELE 8.66 Decreased By ▼ -0.07 (-0.8%)
TPLP 12.39 Increased By ▲ 0.18 (1.47%)
TRG 62.65 Decreased By ▼ -1.71 (-2.66%)
WAVESAPP 10.28 Decreased By ▼ -0.16 (-1.53%)
WTL 1.75 Decreased By ▼ -0.04 (-2.23%)
YOUW 3.97 Decreased By ▼ -0.03 (-0.75%)
BR100 11,814 Increased By 90.4 (0.77%)
BR30 36,234 Increased By 874.6 (2.47%)
KSE100 113,247 Increased By 609 (0.54%)
KSE30 35,712 Increased By 253.6 (0.72%)

The construction work on the two new underpasses along the Lahore Canal will commence from March 15.
This was stated by the Provincial Communication and Development Minister Chaudhry Zaheerudin Khan at a news conference held at the Board of Revenue Committee room on Thursday.
He said under the directives of the Punjab Chief Minister Chaudhry Pervaiz Elahi, his department has already completed two such projects during the last six months on the Mall Road and the FC College.
The new underpasses are being constructed on the Shaukat Ali canal crossing near the Jinnah Hospital and the Doctor's Hospital-Johar Town crossing and each will cost Rs 190 million.
The provincial communication secretary Sibtain Fazal Haleem who was also present at the news briefing told the newsmen that because these underway passes will be on single side of the canal instead of parallel sides, hence their cost is lower as compared to those already constructed.
Speaking about the other projects in the pipeline, the minister mentioned construction of underpass at Committee Chowk, Rawalpindi and a flyover at Jhal Khanwana, Faisalabad.
He said the PC-1 of these projects has been completed and forwarded to the Department of Planning and Development.
About the proposed ring road project in Lahore, Chaudhry Zaheerudin Khan said NESPAK has been entrusted the task of studying the alignment of the road and once all the formalities are completed, the report will be send to the concerned department for approval.
The proposed ring road will have six-lane expressway to facilitate high-speed traffic, connecting to the motorway and roads leading out of the city. Another scheme on the anvil is the reengineering of the Shahrah-i-Quaid-i-Azam to upgrade and renovate the premier road of the city.
The minister further stated that additional underpasses will be constructed at the Kalima Chowk and Azadi Chowk (near Minar-i-Pakistan). "Both these projects are in the planning and designing stages," he stated.

Copyright Associated Press of Pakistan, 2004

Comments

Comments are closed.