AIRLINK 172.80 Decreased By ▼ -2.93 (-1.67%)
BOP 13.24 Increased By ▲ 0.12 (0.91%)
CNERGY 7.42 Decreased By ▼ -0.12 (-1.59%)
FCCL 43.50 Decreased By ▼ -0.41 (-0.93%)
FFL 14.95 Decreased By ▼ -0.06 (-0.4%)
FLYNG 26.50 Decreased By ▼ -0.40 (-1.49%)
HUBC 130.30 Increased By ▲ 0.07 (0.05%)
HUMNL 13.39 Increased By ▲ 0.05 (0.37%)
KEL 4.45 Decreased By ▼ -0.05 (-1.11%)
KOSM 6.02 Decreased By ▼ -0.04 (-0.66%)
MLCF 55.50 Decreased By ▼ -0.53 (-0.95%)
OGDC 215.00 Increased By ▲ 0.23 (0.11%)
PACE 5.94 Decreased By ▼ -0.04 (-0.67%)
PAEL 41.20 Increased By ▲ 0.30 (0.73%)
PIAHCLA 16.66 Increased By ▲ 0.34 (2.08%)
PIBTL 9.66 Decreased By ▼ -0.09 (-0.92%)
POWER 11.55 Decreased By ▼ -0.21 (-1.79%)
PPL 183.50 Increased By ▲ 2.02 (1.11%)
PRL 34.21 Decreased By ▼ -0.01 (-0.03%)
PTC 22.86 Decreased By ▼ -0.20 (-0.87%)
SEARL 94.40 Decreased By ▼ -1.32 (-1.38%)
SILK 1.16 Increased By ▲ 0.02 (1.75%)
SSGC 35.40 Decreased By ▼ -0.05 (-0.14%)
SYM 15.73 Decreased By ▼ -0.02 (-0.13%)
TELE 7.80 Decreased By ▼ -0.07 (-0.89%)
TPLP 10.90 Decreased By ▼ -0.08 (-0.73%)
TRG 60.85 Increased By ▲ 0.35 (0.58%)
WAVESAPP 10.70 Decreased By ▼ -0.11 (-1.02%)
WTL 1.33 Decreased By ▼ -0.02 (-1.48%)
YOUW 3.80 Increased By ▲ 0.03 (0.8%)
BR100 12,047 Decreased By -7 (-0.06%)
BR30 36,424 Decreased By -43.2 (-0.12%)
KSE100 114,235 Decreased By -121.7 (-0.11%)
KSE30 35,252 Decreased By -95.3 (-0.27%)

Traffic movement has been suspended through Lowari Pass due to heavy snow fall/rainfall on Monday (November 29). This was stated in a press release of National Highway Authority (NHA) issued here on Tuesday. The traffic could only move up to Lowari Village at South and Ziarat Post at North.
The snowfall intensity at Lowari Top was 2-feet while it was 6 inch and 4 inch at Lowari Village and Ziarat Post respectively, the release stated.
It was further stated that the personnel of NHA had started snow- removing activity so that traffic movement could be restored.
It is to recall that 309-Km long Nowshera-Chakdara-Chitral road has been federalised and works for its improvement and rehabilitation has been assigned to the NHA.
NHA has divided this highway into six parts for its improvement and rehabilitation work, the release said.

Copyright Associated Press of Pakistan, 2004

Comments

Comments are closed.