AGL 38.30 Increased By ▲ 0.08 (0.21%)
AIRLINK 133.25 Increased By ▲ 4.28 (3.32%)
BOP 8.85 Increased By ▲ 1.00 (12.74%)
CNERGY 4.68 Increased By ▲ 0.02 (0.43%)
DCL 8.64 Increased By ▲ 0.32 (3.85%)
DFML 39.70 Increased By ▲ 0.76 (1.95%)
DGKC 85.38 Increased By ▲ 3.44 (4.2%)
FCCL 34.84 Increased By ▲ 1.42 (4.25%)
FFBL 75.55 Decreased By ▼ -0.16 (-0.21%)
FFL 12.84 Increased By ▲ 0.02 (0.16%)
HUBC 109.80 Decreased By ▼ -0.56 (-0.51%)
HUMNL 14.14 Increased By ▲ 0.13 (0.93%)
KEL 5.40 Increased By ▲ 0.25 (4.85%)
KOSM 7.76 Increased By ▲ 0.09 (1.17%)
MLCF 41.20 Increased By ▲ 1.40 (3.52%)
NBP 70.05 Decreased By ▼ -2.27 (-3.14%)
OGDC 194.25 Increased By ▲ 5.96 (3.17%)
PAEL 26.20 Increased By ▲ 0.57 (2.22%)
PIBTL 7.39 Increased By ▲ 0.02 (0.27%)
PPL 163.85 Increased By ▲ 11.18 (7.32%)
PRL 26.39 Increased By ▲ 1.00 (3.94%)
PTC 19.47 Increased By ▲ 1.77 (10%)
SEARL 84.60 Increased By ▲ 2.18 (2.64%)
TELE 8.00 Increased By ▲ 0.41 (5.4%)
TOMCL 34.00 Increased By ▲ 1.43 (4.39%)
TPLP 8.73 Increased By ▲ 0.31 (3.68%)
TREET 17.15 Increased By ▲ 0.37 (2.21%)
TRG 60.70 Increased By ▲ 4.66 (8.32%)
UNITY 29.00 Increased By ▲ 0.22 (0.76%)
WTL 1.36 Increased By ▲ 0.01 (0.74%)
BR100 10,786 Increased By 127.6 (1.2%)
BR30 32,266 Increased By 934.6 (2.98%)
KSE100 100,083 Increased By 813.5 (0.82%)
KSE30 31,193 Increased By 160.9 (0.52%)

Lahore Electric Supply Company (Lesco) is working to reduce complaints of over billing and related matters and has allocated over Rs 50 million for the correction and replacement of faulty/sluggish meters. More than 2.4 million meters of all types had been installed in the Lesco infrastructure, of which 23,020 meters were checked and replaced during the last year, said a press release here on Monday.
The Lesco also plans to install 300,000 single-phase electric meters and 70,000 three-phase meters in its system. For checking and fault eradication of the meters, the Lesco has extended financial and technical cooperation to the University of Engineering and Technology (UET) Lahore to establish a sophisticated meter-testing laboratory.

Copyright Associated Press of Pakistan, 2005

Comments

Comments are closed.