AIRLINK 217.98 Decreased By ▼ -4.91 (-2.2%)
BOP 10.93 Increased By ▲ 0.11 (1.02%)
CNERGY 7.55 Decreased By ▼ -0.01 (-0.13%)
FCCL 34.83 Decreased By ▼ -2.24 (-6.04%)
FFL 19.32 Increased By ▲ 0.08 (0.42%)
FLYNG 25.15 Decreased By ▼ -1.89 (-6.99%)
HUBC 131.09 Decreased By ▼ -1.55 (-1.17%)
HUMNL 14.56 Decreased By ▼ -0.17 (-1.15%)
KEL 5.18 Decreased By ▼ -0.22 (-4.07%)
KOSM 7.36 Decreased By ▼ -0.12 (-1.6%)
MLCF 45.63 Decreased By ▼ -2.55 (-5.29%)
OGDC 222.08 Decreased By ▼ -1.18 (-0.53%)
PACE 8.16 Decreased By ▼ -0.02 (-0.24%)
PAEL 44.19 Increased By ▲ 0.69 (1.59%)
PIAHCLA 17.69 Decreased By ▼ -0.37 (-2.05%)
PIBTL 8.97 Decreased By ▼ -0.10 (-1.1%)
POWERPS 12.51 Decreased By ▼ -0.50 (-3.84%)
PPL 193.01 Decreased By ▼ -5.23 (-2.64%)
PRL 43.17 Increased By ▲ 0.93 (2.2%)
PTC 26.63 Decreased By ▼ -0.76 (-2.77%)
SEARL 107.08 Decreased By ▼ -3.00 (-2.73%)
SILK 1.04 Decreased By ▼ -0.02 (-1.89%)
SSGC 45.00 Decreased By ▼ -2.30 (-4.86%)
SYM 21.19 Increased By ▲ 0.42 (2.02%)
TELE 10.15 Decreased By ▼ -0.37 (-3.52%)
TPLP 14.51 Decreased By ▼ -0.44 (-2.94%)
TRG 67.28 Decreased By ▼ -1.57 (-2.28%)
WAVESAPP 11.29 Decreased By ▼ -0.63 (-5.29%)
WTL 1.70 Decreased By ▼ -0.09 (-5.03%)
YOUW 4.25 Decreased By ▼ -0.10 (-2.3%)
BR100 12,397 Increased By 33.3 (0.27%)
BR30 37,347 Decreased By -871.2 (-2.28%)
KSE100 117,587 Increased By 467.3 (0.4%)
KSE30 37,065 Increased By 128 (0.35%)

Karachi Electric Supply Corporation (KESC) Managing Director Brigadier Tariq Saddozai has directed KESC transmission and distribution engineers to make arrangements for providing additional power load to industries. The MD issued these directives following a request by Lasbela Chamber of Commerce & Industry (LCCI), whose delegation led by its president Saleem Mandviwala visited KESC head office and held meeting with MD and other senior officials, according to a release of the corporation.
The members of delegation, including MD, Lasbela Industrial Estate Development Authority Colonel Bashir Ahmed Nadeem (retd) and other members of chamber discussed power distribution and transmission facilities to Lasbela industrial zone.
Saleem Mandviwala said that the chamber was aggressively pursuing improvement in industrial production in the area. Sick industries are being revived and efforts for increasing industrial production are going on for which additional power load of 5 MW at Vinder and 4 MW at Hub is required.
MD KESC directed engineers to provide 5 MW additional load at Vinder on top priority evaluating the capacity of power transformer already installed in area.
For Hub, additional power load of 4 MW would also made available for which existing power transformer would replaced by higher capacity transformer to cater additional load. The engineers were directed to carry out the schemes, which would cost corporation about 20 million rupees.
Saddozai said the matter was in purview of Nepra, and LIEDA should submit a proposal, which would be forwarded for judicious decision in this regard.-PR

Copyright Business Recorder, 2005

Comments

Comments are closed.